Green Screens Programme Phase 2
[Fileref]:
004
The London Borough of Lambeth require a provider to design, build and install Green Screens at identified schools in Lambeth, between February 2022 and March 2025, including maintenance of the green screens for 12 months following installation, with appropriate training and handover provided to schools. The number of schools included is expected to be a minimum of 15 but may increase to approximately 25 in total. This is dependent on the extent of green screen needed, which will vary between each school or site. Final measurements and designs for green screens will be determined by the successful provider and approved by the Council and/or School.
[ValueExclVat]:
175000.00
GBP