HS1-ENG-2022-26 - HS1 Electricity Supply Contract (ESC)

The quote/tender has ended, you cannot answer the invitation.

The requirement of the ESC is to allow for forward purchase and Supply of: Traction • HH Traction (4 directly connected supply points); Non-Traction (62 MPANS) • HH Non-Traction: (39 MPANS); • Non HH Non-Traction (23 MPANS). Full site list available on request. Total volume is currently estimated at c. 220GWh reducing to c.170GWh (post consumption efficiency delivery ref target is to reduce total consumption by 30% by 2030) See Figure 2. HS1 traditionally consumes around 240GWh of electricity per annum. Approximately 79% of consumption is through three traction sites which have their own grid supply points. The remaining 21% of consumption is split between the stations, depots and ancillary sites such as switch rooms and signal boxes. The load is reasonably flat throughout all seasons and weighted 87:13 on a day/night basis. Most sites have existing unallocated Available Supply Capacity (ASC) and the business has a close relationship with the incumbent DNO (UKPN).

Supplies

01/09/2022 12:00:00

09310000-5  Electricity
31682000-0  Electricity supplies


HS1 Ltd
5th floor, Kings Place, 90 York Way
N1 9AG
London
United Kingdom
View profile


http://www.highspeed1.co.uk

Lots
HS1 Electricity Supply Contract (ESC)
Additional information:
Documents Documents
Close