NNL602 - W99 Pannel Build

The quote/tender has ended, you cannot answer the invitation.

The SMF is used to transfer material to the AHF facility. It must be purged with nitrogen (N2) prior to export from the AHF to protect the SMF internals. The nitrogen purge system has been designed for this purpose. It comprises several panels with valves and instruments, connected by pipework. The gas supply is provided from standard transportable gas bottles. Specification Outline This specification defines the manufacturing and delivery requirements for the principal pipework panels for performing the N2 purge of the SMF. This document has been produced with reference to the client design requirement specification and the functional specification. A completed design ready for manufacture has been developed in accordance with this specification. Following the detail design it is considered unnecessary for any further design except that necessary by the fabricator for manufacture. This specification defines the manufacturing, works testing and delivery requirements for the SMF Nitrogen Purge System Test Aid. A completed design ready for manufacture has been developed in accordance with this specification. Following the detail design, it is considered unnecessary for any further design except that necessary by the contractor for manufacture (e.g. profile drawings for stainless steel plates).

15/11/2024 17:00:00

42124300-7  Parts of air or vacuum pumps, of air or gas compressors
42124340-9  Parts of gas compressors
42514320-1  Gas filters
31711400-7  Valves and tubes
42131142-3  Control valves
42131170-8  Gas-cylinder outlet valves
31600000-2  Electrical equipment and apparatus


United Kingdom National Nuclear Laboratory
Chadwick House, Birchwood Park
WA3 6AE
Warrington
United Kingdom
View profile


https://www.nnl.co.uk/

Published notices
Live Opportunity (Contracts Finder) 31/10/2024 10:08
Lots
W99 Pannel Build
Additional information:
Documents Documents