Date of dispatch of this notice: 31/10/2024
Expire date: 15/11/2024
External Reference: e7dc2bbd-ff43-44f2-8173-7aa3bc1f34c7
Date of dispatch of this notice: 31/10/2024
Expire date: 15/11/2024
External Reference: e7dc2bbd-ff43-44f2-8173-7aa3bc1f34c7
Official name: National Nuclear Laboratory
Url: https://www.nnl.co.uk/
Address line 1: Chadwick House, Birchwood Park
Town: Warrington
Postal Code: WA3 6AE
Country: England
Contact person: Izak Cartain-Farish
E-mail: Izak.Cartain-Farish@uknnl.com
Phone: +44 01925933825
Title attributed to the contract: W99 Pannel Build
Description:
The SMF is used to transfer material to the AHF facility. It must be purged with nitrogen (N2) prior to export from the AHF to protect the SMF internals. The nitrogen purge system has been designed for this purpose. It comprises several panels with valves and instruments, connected by pipework. The gas supply is provided from standard transportable gas bottles. Specification Outline This specification defines the manufacturing and delivery requirements for the principal pipework panels for performing the N2 purge of the SMF. This document has been produced with reference to the client design requirement specification and the functional specification. A completed design ready for manufacture has been developed in accordance with this specification. Following the detail design it is considered unnecessary for any further design except that necessary by the fabricator for manufacture. This specification defines the manufacturing, works testing and delivery requirements for the SMF Nitrogen Purge System Test Aid. A completed design ready for manufacture has been developed in accordance with this specification. Following the detail design, it is considered unnecessary for any further design except that necessary by the contractor for manufacture (e.g. profile drawings for stainless steel plates).
Additional data
User / Company