23PROC086 - Castle Quay Units 36-39 Enabling Works

[EndedMessage]

Units 36-39 are located within Castle Quay Shopping Centre and relate to former BHS first floor and former GAP store ground and first floor. All areas are currently vacant and fit out as left by previous Tenant's and form part of the wider shopping centre premises. This project comprises the strip out of the first floor of the former BHS unit, both ground and first floors of the former GAP unit, and the associated roof areas of Castle Quay shopping centre in Banbury. Landlord’s Common Parts will be retained / reconfigured as necessary to ensure that on completion of the works they are strategically best placed for the refurbishment and fitout works, and the contractor will complete various surveys during the strip out to further inform the Council as they complete their designs for the future fit-out works package These works are an enabling works package which is to be completed ahead of a fit-out of the units. The works will see both units stripped back to grey shell, with redundant services and plant removed, drainage capped off, fire alarm systems left in-situ and sprinklers left in-situ & adapted, the retention for the proposed future facilities in line with the specification(s) and to ensure the areas remain protected.

2023-11-06 12:00:00

45111000-8  [46349]
45110000-1  [46348]
45111200-0  [46351]
45111213-4  [46355]
45111291-4  [46363]
45111300-1  [46364]
45113000-2  [46398]


Cherwell District Council
Bodicote House, White Post Road
OX15 4AA
Banbury
[GB]
[ViewProfile]

[PublishedNotices]
[CF02LiveOpportunity] ([ContractsFinderV2]) 2023-10-12 17:48
[FtsS09F02ContractNotice] ([FTS])
[Packages]
Castle Quay Units 36-39 Enabling Works
[AdditionalInfo]:
[Documents] [Documents]
[Close]