The London fire commissioner (LFC) is looking to award a service contract to a qualified contractor for the maintenance of its high pressure breathable oxygen and air compressors, high pressure pipework and associated distribution systems. The LFC operates high pressure breathing air compressor systems at three sites collectively run by The Operations Support Group (OSG). The Operations Support Centre (OSC) is the main site based in Croydon, with satellite charging rooms located at Park Royal fire station and Barking Fire station. Both OSC and Barking charging room have oxygen charging capability. The high-pressure air system not only supplies cylinder recharging but also supports our Respiratory Protective Equipment (RPE), Gas Tight Suit (GTS), Cylinder testing and other areas throughout our sites and are regulated at various pressures. As part of the commitment to firefighter safety and to maintain operational capacity, the LFC requires the provision of maintenance to its high-pressure breathing air and breathable oxygen compressor systems, high pressure pipework and distribution systems
Services
23/12/2022 12:00:00
50000000-5 Repair and maintenance services
London Fire Commissioner
169 Union Street
SE1 0LL
London
United Kingdom
View profile
Notice | Date of dispatch |
---|---|
Live Opportunity (Contracts Finder) | 28/11/2022 18:08 |
Contract notice (FTS) |