Northamptonshire Police, Fire and Crime Commissioner wish to establish a multi Provider framework agreement for the provision of Estates and Facilities Services to include; pre planned maintenance, reactive services, general building and facilities services, project work and waste and decontamination services. Full details of all areas are included in SECTION 3 Requirements of the ITT.
Services
09/09/2022 12:00:00
79993100-2 Facilities management services
45310000-3 Electrical installation work
45331000-6 Heating, ventilation and air-conditioning installation work
45331110-0 Boiler installation work
45331200-8 Ventilation and air-conditioning installation work
45332000-3 Plumbing and drain-laying work
45332200-5 Water plumbing work
50750000-7 Lift-maintenance services
70310000-7 Building rental or sale services
70320000-0 Land rental or sale services
79993000-1 Building and facilities management services
90510000-5 Refuse disposal and treatment
90520000-8 Radioactive-, toxic-, medical- and hazardous waste services
90910000-9 Cleaning services
35120000-1 Surveillance and security systems and devices
45000000-7 Construction work
45210000-2 Building construction work
45216120-1 Construction work for buildings relating to emergency services
71500000-3 Construction-related services
71530000-2 Construction consultancy services
71541000-2 Construction project management services
90731500-5 Toxic gas detection services
35111300-8 Fire extinguishers
Police, Fire and Crime Commissioner for Northamptonshire
Darby House, Darby Close, Park Farm Industrial Estate
NN8 6GS
Wellingborough
United Kingdom
View profile
Notice | Date of dispatch |
---|---|
Live Opportunity (Contracts Finder) | 05/08/2022 21:03 |
Contract notice (FTS) |
Northamptonshire Police, Fire and Crime Commissioner wish to establish a multi Provider framework agreement for the provision of Estates and Facilities Services to include; pre planned maintenance, reactive services, general building and facilities services, project work and waste and decontamination services. Full details of all Lots /disciplines are included in SECTION 3 Requirements of the ITT.
Attached as document
This Lots include the provision of pre-planned maintenance requirements and associated repairs to ensure compliance and meet statutory obligations. Pre-Planned maintenance refers to any activity that is scheduled and planned to ensure there is a strategy to maintain the standard and resilience of equipment and buildings within a Contracting Bodies Estate. The disciplines covered in this Lot are set out in the ITT, Section 3 Requirements.
Attached as document
This Lots include the provision of pre-planned maintenance requirements and associated repairs to ensure compliance and meet statutory obligations. Pre-Planned maintenance refers to any activity that is scheduled and planned to ensure there is a strategy to maintain the standard and resilience of equipment and buildings within a Contracting Bodies Estate. The disciplines covered in this Lot are set out in the ITT, Section 3 Requirements.
Attached as document
This Lots include the provision of pre-planned maintenance requirements and associated repairs to ensure compliance and meet statutory obligations. Pre-Planned maintenance refers to any activity that is scheduled and planned to ensure there is a strategy to maintain the standard and resilience of equipment and buildings within a Contracting Bodies Estate. The disciplines covered in this Lot are set out in the ITT, Section 3 Requirements.
Attached as document
This Lots include the provision of pre-planned maintenance requirements and associated repairs to ensure compliance and meet statutory obligations. Pre-Planned maintenance refers to any activity that is scheduled and planned to ensure there is a strategy to maintain the standard and resilience of equipment and buildings within a Contracting Bodies Estate. The disciplines covered in this Lot are set out in the ITT, Section 3 Requirements.
Attached as document
This Lot include the provision of reactive work requirements for the Contracting Body allowing them to respond to issues arising in their estates. The Lot shall cover the following reactive work: i. Heating and plumbing ii. Electrical Services and emergency lighting iii. Heating, Ventilation and Air Conditioning (HVAC) iv. Generators v. Gates, barriers and doors including access control vi. Fire detection and suppression systems vii. UPS viii. Roofing
Attached as document
This Lot include the provision of reactive work requirements for the Contracting Body allowing them to respond to issues arising in their estates. The Lot shall cover the following reactive work: i. Heating and plumbing ii. Electrical Services and emergency lighting iii. Heating, Ventilation and Air Conditioning (HVAC) iv. Generators v. Gates, barriers and doors including access control vi. Fire detection and suppression systems vii. UPS viii. Roofing
Attached as document
This Lot include the provision of reactive work requirements for the Contracting Body allowing them to respond to issues arising in their estates. The Lot shall cover the following reactive work: i. Heating and plumbing ii. Electrical Services and emergency lighting iii. Heating, Ventilation and Air Conditioning (HVAC) iv. Generators v. Gates, barriers and doors including access control vi. Fire detection and suppression systems vii. UPS viii. Roofing
Attached as document
This Lot include the provision of reactive work requirements for the Contracting Body allowing them to respond to issues arising in their estates. The Lot shall cover the following reactive work: i. Heating and plumbing ii. Electrical Services and emergency lighting iii. Heating, Ventilation and Air Conditioning (HVAC) iv. Generators v. Gates, barriers and doors including access control vi. Fire detection and suppression systems vii. UPS viii. Roofing
Attached as document
This Lots include the provision of pre-planned maintenance requirements and associated repairs to ensure compliance and meet statutory obligations. Pre-Planned maintenance refers to any activity that is scheduled and planned to ensure there is a strategy to maintain the standard and resilience of equipment and buildings within a Contracting Bodies Estate. The disciplines covered in this Lot are set out in the ITT, Section 3 Requirements.
Attached as document
This Lots include the provision of pre-planned maintenance requirements and associated repairs to ensure compliance and meet statutory obligations. Pre-Planned maintenance refers to any activity that is scheduled and planned to ensure there is a strategy to maintain the standard and resilience of equipment and buildings within a Contracting Bodies Estate. The disciplines covered in this Lot are set out in the ITT, Section 3 Requirements.
Attached as document
This Lots include the provision of pre-planned maintenance requirements and associated repairs to ensure compliance and meet statutory obligations. Pre-Planned maintenance refers to any activity that is scheduled and planned to ensure there is a strategy to maintain the standard and resilience of equipment and buildings within a Contracting Bodies Estate. The disciplines covered in this Lot are set out in the ITT, Section 3 Requirements.
Attached as document
This Lots include the provision of pre-planned maintenance requirements and associated repairs to ensure compliance and meet statutory obligations. Pre-Planned maintenance refers to any activity that is scheduled and planned to ensure there is a strategy to maintain the standard and resilience of equipment and buildings within a Contracting Bodies Estate. The disciplines covered in this Lot are set out in the ITT, Section 3 Requirements.
Attached as document
This Lot include the provision of reactive work requirements for the Contracting Body allowing them to respond to issues arising in their estates. The Lot shall cover the following reactive work: i. Heating and plumbing ii. Electrical Services and emergency lighting iii. Heating, Ventilation and Air Conditioning (HVAC) iv. Generators v. Gates, barriers and doors including access control vi. Fire detection and suppression systems vii. UPS viii. Roofing
Attached as document
This Lot include the provision of reactive work requirements for the Contracting Body allowing them to respond to issues arising in their estates. The Lot shall cover the following reactive work: i. Heating and plumbing ii. Electrical Services and emergency lighting iii. Heating, Ventilation and Air Conditioning (HVAC) iv. Generators v. Gates, barriers and doors including access control vi. Fire detection and suppression systems vii. UPS viii. Roofing
Attached as document
This Lot include the provision of reactive work requirements for the Contracting Body allowing them to respond to issues arising in their estates. The Lot shall cover the following reactive work: i. Heating and plumbing ii. Electrical Services and emergency lighting iii. Heating, Ventilation and Air Conditioning (HVAC) iv. Generators v. Gates, barriers and doors including access control vi. Fire detection and suppression systems vii. UPS viii. Roofing
Attached as document
This Lot include the provision of reactive work requirements for the Contracting Body allowing them to respond to issues arising in their estates. The Lot shall cover the following reactive work: i. Heating and plumbing ii. Electrical Services and emergency lighting iii. Heating, Ventilation and Air Conditioning (HVAC) iv. Generators v. Gates, barriers and doors including access control vi. Fire detection and suppression systems vii. UPS viii. Roofing
Attached as document
Lot 5 includes the provision for General Estates and Facilities Infrastructure Services and work. The Lot shall cover the following disciplines: i. General building, carpentry and decorating ii. Surfacing iii. Flooring iv. Windows v. Grounds maintenance vi. Blinds and curtains vii. Tree surgery viii. CCTV This lot is available for use by Contracting Bodies across the UK
Attached as document
Lot 6 includes the provision for a range of Miscellaneous Estates and Facilities services. The Lot shall cover the following services: i. Gritting ii. Passenger lifts, platform lifts and catering lifts iii. Water coolers iv. Masts and aerials/anchor points and latchway v. Appliance and industrial doors vi. Reception and/or security duties vii. Drainage, gullies and guttering This lot is available for use by Contracting Bodies across the UK.
Attached as document
Lot 7 includes the provision of Estate and Facilities projects, works and services up to a value of £500,000.00. Services, Works and Projects refer to any activity that is scheduled and planned under the following disciplines; i. Construction consultants and Building Work/Services ii. Valuation and Business rates advice iii. Property land agents
Attached as document
Lot 8 includes the provisions for the disposal of both dry and hazardous waste and Decontamination Services, including forensic cleaning in multiple settings such as, but limited to, witness interview suites, cells and or vehicles (or any other specialist areas). This lot is available for use by Contracting Bodies across the UK.
Attached as document