[DateDispatch]: 5-7-2024
[ExpireDate]: 9-8-2024
[ExternalReference]: a8c5d7a0-f8a2-4a7d-b394-cc2329caf2cf
[DateDispatch]: 5-7-2024
[ExpireDate]: 9-8-2024
[ExternalReference]: a8c5d7a0-f8a2-4a7d-b394-cc2329caf2cf
Official name: United Kingdom Atomic Energy Authority
Url: www.gov.uk/government/organisations/uk-atomic-energy-authority
Address line 1: Culham Campus
Town: Abingdon
Postal Code: OX14 3DB
Country: England
Contact person: Matt Burton
E-mail: matt.burton@ukaea.uk
Phone: +44 1235467082
Title attributed to the contract: RACE STORM MOCK UP JOINT STILLAGE
Description:
UK Atomic Energy Authority (UKAEA), based at the Culham Science Centre in Oxfordshire, hereafter referred to as the Purchaser, carries out research into the use of controlled fusion for the generation of power. As part of this work, the manufacture and assembly of a Return Limb Pedestal Stillage (hereafter referred to as the ‘Stillage) is required. The stillage assembly forms part of the mock-up test facility and is for the temporary storage of a return limb pedestal. The stillage assembly is designed for the storage of a return limb pedestal. It is a welded and bolted assembly and is comprised of the following main components: • Alignment fixtures • Stillage fabrication • Bottom support plates • Inner and outer locking plates • Bolted Base Plate The Supplier shall manufacture, inspect, and deliver 3-off complete Stillage, along with all associated fixings, to the Purchaser’s delivery address. The assembled unit will comprise of the machined and fabricated components including all associated fasteners.
Additional data
User / Company