The requirement of the ESC is to allow for forward purchase and Supply of:
Traction
• HH Traction (4 directly connected supply points);
Non-Traction (62 MPANS)
• HH Non-Traction: (39 MPANS);
• Non HH Non-Traction (23 MPANS).
Full site list available on request.
Total volume is currently estimated at c. 220GWh reducing to c.170GWh (post consumption efficiency delivery ref target is to reduce total consumption by 30% by 2030) See Figure 2.
HS1 traditionally consumes around 240GWh of electricity per annum. Approximately 79% of consumption is through three traction sites which have their own grid supply points. The remaining 21% of consumption is split between the stations, depots and ancillary sites such as switch rooms and signal boxes. The load is reasonably flat throughout all seasons and weighted 87:13 on a day/night basis. Most sites have existing unallocated Available Supply Capacity (ASC) and the business has a close relationship with the incumbent DNO (UKPN).