[FtsS09F01PriorInformationNotice]

[Information]

[Published]

[ExpireDate]: 14.10.2021

[ExternalReference]: 2021-502316

[FtsReference]: 2021-022830

[FtsS09F01PriorInformationNotice]

[NoticePin]

[Supplies]

[NoticeIsPriorInfoOnly]

[Section1]: [Ca]

I.1)

[NameAddressContact]

United Kingdom Atomic Energy Authority
N/A
Culham Science Centre
Abingdon
OX14 3DB
UK
[Contactpoint]: Theodora Bampatsia
[AddressPhone]: +44 1235467082
[Nutscode]:  UKJ14 -  Oxfordshire
[Internets]:
I.2)

[JointProcurement]

[JointProcurementCentral]
I.3)

[InfoTendering]

[AddressObtainDocs]:  
https://uk.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=39588&B=UK
[AddressFurtherinfo]
[AsContactsAbove]:  
I.4)

[CaType]

[MaintypePublicbody]
I.5)

[Mainactivity]

[OtherActivity]:  Fusion Research

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

H3AT- Roughing Pumps (Developmental)
[Fileref]:  T/DB185/21
II.1.2)

[CpvMain]

42122450  - 
II.1.3)

[TypeContract]

[Supplies]
II.1.4)

[DescrShort]

UKAEA wishes to engage with potential prime contractors, SME’s, vacuum pump manufacturers for the development and supply of 15-off vacuum roughing pumps for use with tritium, associated controllers and cabling. Quantities to be confirmed following preliminary and detailed design. These pumps will be for use in a number of sub-systems that will make up the Tritium Plant located within the new H3AT Facility currently in construction on the UKAEA Culham site.
II.1.6)

[LotsInfo]

[DivisionLots]: [No]
II.2)

[Description]

II.2.2)

[CpvAdditional]

09343000  - 
42124320  - 
71300000  - 
71320000  - 
71323000  - 
71336000  - 
71340000  - 
71350000  - 
73000000  - 
73100000  - 
73300000  - 
73430000  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  UKJ14 -  Oxfordshire
II.2.4)

[DescrProcurement]

UKAEA wishes to engage with potential prime contractors, SME’s, vacuum pump manufacturers for the development and supply of 15-off vacuum roughing pumps for use with tritium, associated controllers and cabling. Quantities to be confirmed following preliminary and detailed design. These pumps will be for use in a number of sub-systems that will make up the Tritium Plant located within the new H3AT Facility currently in construction on the UKAEA Culham site.
II.3)

[DateOfContractNotice]:

20.12.2021

[Section4]: [Procedure]

IV.1)

[Description]

IV.1.8)

[GpaInfo]

[GpaCovered] : [Yes]
IV.2)

[InfoAdmin]

[Section6]: [InfoComplement]