Beech Hurst Boiler Replacement
Numéro de référence:
PAM020
II.1.2)
Code CPV principal
Fournitures
II.1.4)
Description succincte
Beech Hurst is the headquarters building for Test Valley Borough Council (TVBC) with four number plant rooms located at third floor level, with restricted access from the mezzanine floor. Each plant room contains three gas modular boilers providing heating to each corner of the building (NE, NW, SE, and SW)
The project comprises of the replacement of the existing Gas fired modular boilers installed in the region of 30 years ago with new modern energy efficient LPHW gas boilers and flues, together with new Building Management Control (BMS) package, weather compensation technology and optimised controls. Including all builders work in conjunction with these works.
The selected contractor will be responsible for all aspects of the delivery of works and the co-ordination of all sub-contractors.
It is intended that the works be carried out in two phases over the summer of 2020 carrying out works to two boiler rooms at any one time.
II.1.5)
Valeur totale estimée
Valeur hors TVA: 500000.00
GBP
II.1.6)
Information sur les lots
Ce marché est divisé en lots:
non
II.2.2)
Code(s) CPV additionnel(s)
II.2.4)
Description des prestations
Beech Hurst is the headquarters building for Test Valley Borough Council (TVBC) with four number plant rooms located at third floor level, with restricted access from the mezzanine floor. Each plant room contains three gas modular boilers providing heating to each corner of the building (NE, NW, SE, and SW)
The project comprises of the replacement of the existing Gas fired modular boilers installed in the region of 30 years ago with new modern energy efficient LPHW gas boilers and flues, together with new Building Management Control (BMS) package, weather compensation technology and optimised controls. Including all builders work in conjunction with these works.
The selected contractor will be responsible for all aspects of the delivery of works and the co-ordination of all sub-contractors.
It is intended that the works be carried out in two phases over the summer of 2020 carrying out works to two boiler rooms at any one time. The contractors attention is drawn to the fact that the office will be fully open during the contract period; method statements and previous experience submitted should reflect these and all other relevant facts.
II.2.5)
Critères d’attribution
Le prix n'est pas le seul critère d'attribution et tous les critères sont énoncés uniquement dans les documents du marché
Valeur hors TVA: 500000.00
GBP
II.2.7)
Durée du marché, de l'accord-cadre ou du système d'acquisition dynamique
Début:
15/06/2020
/
Fin:
14/09/2020
Ce marché peut faire l'objet d'une reconduction:
non
Des variantes seront prises en considération:
oui
II.2.11)
Information sur les options
Options:
non
II.2.13)
Information sur les fonds de l'Union européenne
Le contrat s'inscrit dans un projet/programme financé par des fonds de l'Union européenne:
non
II.2.14)
Informations complémentaires
Full information can be accessed on our eTendering system at https://uk.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=32704&B=UK