[FtsS09F01PriorInformationNotice]

[Information]

[Published]

[ExpireDate]: 10/12/2021

[ExternalReference]: 2021-580838

[FtsReference]: 2021-027023

[FtsS09F01PriorInformationNotice]

[NoticePin]

[Supplies]

[NoticeIsPriorInfoOnly]

[Section1]: [Ca]

I.1)

[NameAddressContact]

United Kingdom Atomic Energy Authority
N/A
Culham Science Centre
Abingdon
OX14 3DB
UK
[Contactpoint]: Romi Barnett
[AddressEmail]: romi.barnett@ukaea.uk
[Nutscode]:  UKJ14 -  Oxfordshire
[Internets]:
I.3)

[InfoTendering]

[AddressObtainDocs]:  
https://uk.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=40299&B=UK
[AddressFurtherinfo]
[AsContactsAbove]:  
I.4)

[CaType]

[MaintypePublicbody]
I.5)

[Mainactivity]

[OtherActivity]:  Fusion Research

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

Transmission Line System of the MAST-U EBW system
[Fileref]:  T/HS242/21
II.1.2)

[CpvMain]

31711422  - 
II.1.3)

[TypeContract]

[Supplies]
II.1.4)

[DescrShort]

The scope of this PIN is to outline the expected transmission line system in preparation for a formal bid process, and understand the capability and capacity of industry, via supplier responses, to undertake the future projectThe routing of the transmission line has not been finalised, but there are two primary paths that cover the extreme cases, which are presented as two options for assessing the procurement feasibility.
Option 1: Has a minimum path using 88.9mm and 50 mm (or equivalents), with an estimated length of 45m and two mitre bend configuration.
Option 2: Has the maximum path using 115mm, 88.9mm and 50mm (or equivalents), with an estimated length of 55m and 4 mitre bends.
II.1.5)

[ValueMagnitudeEstimatedTotal]

[ValueExclVat]: 100000.00  GBP
II.1.6)

[LotsInfo]

[DivisionLots]: [No]
II.2)

[Description]

II.2.2)

[CpvAdditional]

31711420  - 
71300000  - 
73200000  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  UKJ14 -  Oxfordshire
II.2.4)

[DescrProcurement]

The scope of this PIN is to outline the expected transmission line system in preparation for a formal bid process, and understand the capability and capacity of industry, via supplier responses, to undertake the future projectThe routing of the transmission line has not been finalised, but there are two primary paths that cover the extreme cases, which are presented as two options for assessing the procurement feasibility.
Option 1: Has a minimum path using 88.9mm and 50 mm (or equivalents), with an estimated length of 45m and two mitre bend configuration.
Option 2: Has the maximum path using 115mm, 88.9mm and 50mm (or equivalents), with an estimated length of 55m and 4 mitre bends.
II.3)

[DateOfContractNotice]:

17-1-2022

[Section4]: [Procedure]

IV.1)

[Description]

IV.1.8)

[GpaInfo]

[GpaCovered] : [Yes]
IV.2)

[InfoAdmin]

[Section6]: [InfoComplement]