II.1)
[QuantityScopeContract]
PRO004751-Works-Framework-Minor Works
[Fileref]:
AMP8 MW
[Works]
United Utilities (UU) 5 year asset management plans for the AMP8 period (and AMP9) has adopted a delivery model formed of 5 distinct delivery runways.
The scope of this procurement is for the Build-Only delivery runway and this is the Minor Works element of that runway. This procurement is split into 2 Lots. The scope of works will be construction of assets in the following 2 categories:
Lot 1 - Civils Construction (20 awards)
Lot 2 - Mechanical & Electrical Installation (10 awards)
In total up to 30 framework agreements will be awarded.
Projects will be awarded via NEC4 based call-off contracts. The number of projects awarded will be subject to AMP8 requirements and dependent on the size, type and geography of the final agreed programme for AMP8, and beyond.
II.1.5)
[ValueMagnitudeEstimatedTotal]
[ValueExclVat]: 800000000.00
GBP
[DivisionLots]:
[Yes]
[LotsSubmittedFor]
[LotsAll]
[LotsMaxAwarded]:
1
Civils Construction
[LotNumber]:
1
45200000
-
45221200
-
45231300
-
45240000
-
45247000
-
45252000
-
71248000
-
45220000
-
II.2.3)
[PlacePerformance]
[Nutscode]:
UKD -
NORTH WEST (ENGLAND)
II.2.4)
[DescrProcurement]
Water Treatment and Network Pipelines, Waste Water Treatment and Network Pipelines, Bioresources, Pumping Stations & Storage, CSO’s
Work types that we envisage will form part of the Lot 1 Civils Construction works include:
Sludge treatment digesters and tanks
Chemical Dosing Rigs
Primary, secondary & tertiary wastewater treatment process
Gas systems
CSO chamber installations & pump return
Sewer/Large Diameter Trunk Mains upsizing and installations
Buried pipework
Demolition
Fish Passages
Pre-fabricated tanks
Concrete in-situ tank installations
Media Changes
Boreholes
Access Roads and Site Facilities
Other construction works
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 560000000.00
GBP
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
130
[RenewalsSubject]:
[No]
[EnvisagedMin]:
30
/
[MaxNumber]:
35
[CriteriaChoosingLimited]:
Selection criteria as stated in the procurement documents
[VariantsAccepted]:
[No]
[Options]:
[Yes]
[OptionsDescr]:
United Utilities shall have the option to extend beyond the initial term of 6 years for one or more further periods of up to 5 years in total, up to a longstop date of 31 March 2035.
[EuProgrRelated]:
[No]
Mechanical & Electrical Installation
[LotNumber]:
2
45200000
-
45220000
-
45221200
-
45231300
-
45240000
-
45247000
-
45252000
-
71248000
-
II.2.3)
[PlacePerformance]
[Nutscode]:
UKD -
NORTH WEST (ENGLAND)
II.2.4)
[DescrProcurement]
Water Treatment and Network Pipelines, Waste Water Treatment and Network Pipelines, Bioresources, Pumping Stations & Storage, CSO’s
Work types that we envisage will form part of the Lot 2 Mechanical & Electrical Installation works include:
Sludge treatment, digestion, handling and pumping
CHP Engines
Chemical Dosing Rigs
Pumps and pumping systems
Primary, secondary & tertiary wastewater treatment process
Instrumentation and alarms
Safety Instrumented Systems
Above-ground pipework
Valves and actuators
Pressure vessels and boilers
Heat exchangers
Gas systems including storage, consumers, pipework and ancillaries
Equipment and protective systems for use in explosive atmospheres
CSO chamber installations & pump return
Screen & weir installations
MEICA Installation and commissioning
Other M&E Installation works.
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 240000000.00
GBP
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
130
[RenewalsSubject]:
[No]
[EnvisagedMin]:
16
/
[MaxNumber]:
21
[CriteriaChoosingLimited]:
Selection criteria as stated in the procurement documents
[VariantsAccepted]:
[No]
[Options]:
[Yes]
[OptionsDescr]:
United Utilities shall have the option to extend beyond the initial term of 6 years for one or more further periods of up to 5 years in total, up to a longstop date of 31 March 2035.
[EuProgrRelated]:
[No]