[FtsS09F02ContractNotice]

[Information]

[Published]

[ExpireDate]: 15.09.2022

[ExternalReference]: 2022-596993

[FtsReference]: 2022-022853

[FtsS09F02ContractNotice]

[NoticeContract]

[Section1]: [Ca]

I.1)

[NameAddressContact]

Hyde Housing Association Ltd
IP18195R
30 Park Street
London
SE1 9EQ
UK
[Contactpoint]: Tarvinder Bhungle
[AddressPhone]: +44 2073785074
[Nutscode]:  UK -  UNITED KINGDOM
[Internets]:
I.3)

[InfoTendering]

[AddressObtainDocs]:  
https://uk.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=51847&B=HYDE-HOUSING
[AddressFurtherinfo]
[AsContactsAbove]:  
[AddressSendTendersRequest]
[AddressSendTendersRequest]
[AddressToAbove]
I.4)

[CaType]

[MaintypePublicbody]
I.5)

[Mainactivity]

[MainactivHousing]

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

South East New Energy (SENE) European Regional Development Fund (ERDF) Energy Retrofit Project
II.1.2)

[CpvMain]

45321000  - 
II.1.3)

[TypeContract]

[Works]
II.1.4)

[DescrShort]

Hyde’s intention in respect of this invitation to tender is for the installation of renewable technologies, equipment, and fabric measures in Hyde properties in Kent. The Contractor will generally be required to carry out the design and installation of renewable technologies and equipment, including Solar PV and Air Source Heat Pumps, as well as fabric measures, such as loft and cavity wall insulation, and ventilation measures.
II.1.5)

[ValueMagnitudeEstimatedTotal]

[ValueExclVat]: 900000.00  GBP
II.1.6)

[LotsInfo]

[DivisionLots]: [No]
II.2)

[Description]

II.2.2)

[CpvAdditional]

09300000  - 
09323000  - 
09331100  - 
09331200  - 
31527260  - 
31610000  - 
45100000  - 
45210000  - 
45211310  - 
45232141  - 
45260000  - 
45261211  - 
45261410  - 
45300000  - 
45315300  - 
45320000  - 
45331000  - 
45400000  - 
45421100  - 
45421151  - 
71200000  - 
71300000  - 
71500000  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  UK -  UNITED KINGDOM
II.2.4)

[DescrProcurement]

Hyde’s intention in respect of this invitation to tender is for the installation of renewable technologies, equipment, and fabric measures in Hyde properties in Kent. The Contractor will generally be required to carry out the design and installation of renewable technologies and equipment, including Solar PV and Air Source Heat Pumps, as well as fabric measures, such as loft and cavity wall insulation, and ventilation measures. The works carried out must be compliant with PAS 2035:2019 and all installations must comply with PAS 2030:2019 requirements. Energy efficiency measures within the scope of PAS 2030:2019 must be delivered by installers who are certified to that standard for the measure to be installed. It is the role of the Retrofit Coordinator to ensure installers are competent and qualified to the required standards. The installer(s) of the measures must be TrustMark registered. Micro-Generation Scheme (MCS) certificates will be required where low carbon heating systems are installed.
II.2.5)

[AwardCriteria]

[AwardCriteriaDescriptive]
II.2.6)

[ValueMagnitudeEstimated]

[ValueExclVat]: 900000.00  GBP
II.2.7)

[DurationContractFrameworkDps]

[Starting]: 17.10.2022  /  [End]: 30.07.2023
[RenewalsSubject]: [No]
II.2.10)

[VariantsInfo]

[VariantsAccepted]: [No]
II.2.11)

[OptionsInfo]

[Options]: [No]
II.2.12)

[ElectronicCatalogue]

[ElectronicCatalogueRequired]
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [Yes]
[EuProgrRef]: European Regional Development Fund (ERDF) funded programme
II.2.14)

[InfoAdditional]

*All practical works undertaken in this contract must be completed by 30th June 2023.*

[Section3]: [InfoLegal]

III.1)

[ConditionsParticip]

III.1.1)

[SituationPersonalIncl]

[InfoEvaluatingRequir]:  As per tender documents
III.1.2)

[EconomicFinancialStanding]

[InfoEvaluatingWethRequir]:  
As per tender documents
[MinStandardsRequired]:  
As per tender documents
III.1.3)

[TechnicalCapacity]

[InfoEvaluatingWethRequir]:  
As per tender documents
[MinStandardsRequired]:  
As per tender documents
III.2)

[ConditionsContract]

III.2.2)

[OtherConditions]

As per tender documents
III.2.3)

[StaffResponsible]

[StaffResponsibleIndicate]

[Section4]: [Procedure]

IV.1)

[Description]

IV.1.1)

[TypeProcedure]

[ProctypeOpen]
IV.1.8)

[GpaInfo]

[GpaCovered] : [No]
IV.2)

[InfoAdmin]

IV.2.2)

[LimitReceiptTendersReqPart]

[Date]:  15.09.2022
[Time]:  15:00
IV.2.4)

[LanguagesAllowed]

[Language_EN]
IV.2.6)

[MinTimeMaintain]

[DurationMonths] : 6  ([FromStatedDate])
IV.2.7)

[OpeningConditions]

[Date]:  15.09.2022
[Time]:  15:00

[Section6]: [InfoComplement]

VI.1)

[RecurrenceInfo]

[RecurrentProcurement]:  [No]
VI.2)

[InfoEworkflow]

[EorderingUsed]
[EinvoicingUsed]
[EpaymentUsed]
VI.3)

[InfoAdditional]

Hyde’s intention in respect of this invitation to tender is for the installation of renewable technologies, equipment, and fabric measures in Hyde properties in Kent. The Contractor will generally be required to carry out the design and installation of renewable technologies and equipment, including Solar PV and Air Source Heat Pumps, as well as fabric measures, such as loft and cavity wall insulation, and ventilation measures.
The works carried out must be compliant with PAS 2035:2019 and all installations must comply with PAS 2030:2019 requirements.
Energy efficiency measures within the scope of PAS 2030:2019 must be delivered by installers who are certified to that standard for the measure to be installed. It is the role of the Retrofit Coordinator to ensure installers are competent and qualified to the required standards.
The installer(s) of the measures must be TrustMark registered. Micro-Generation Scheme (MCS) certificates will be required where low carbon heating systems are installed.
*All practical works undertaken in this contract must be completed by 30th June 2023.*
VI.4)

[AppealsProcedure]

VI.4.1)

[AppealsBody]

Royal Courts of Justice
The Strand
London
WC2A 2LL
UK