SERSF Decarbonisation Project
[Fileref]:
2013FXPlus
Falmouth Exeter Plus (FXPlus) is looking to appoint a single supply partner to carry out the decarbonisation project for SERFS and Stella Turk buildings at the Penryn Campus, Penryn. The work will include;- Design and install ASHP heating system as per option 1 of feasibility study included in supporting documentation. Ensure integration with existing heating system. Provide certificate of compliance, O&M manuals and method to demonstrate energy savings upon completion. Decommissioning of existing gas-powered boilers.