[FtsS09F01PriorInformationNotice]

[Information]

[Published]

[ExpireDate]: 2024-02-23

[ExternalReference]: 2024-586532

[FtsReference]: 2024-004483

[FtsS09F01PriorInformationNotice]

[NoticePin]

[Services]

[NoticeIsPriorInfoOnly]

[Section1]: [Ca]

I.1)

[NameAddressContact]

United Kingdom Atomic Energy Authority
N/A
Culham Campus
Abingdon
OX14 3DB
UK
[Contactpoint]: Catherine Sirotkin
[AddressPhone]: +44 1235467082
[Nutscode]:  UK -  UNITED KINGDOM
[Internets]:
I.3)

[InfoTendering]

[AddressObtainDocs]:  
https://uk.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=78174&B=UKAEA
[AddressFurtherinfo]
[AsContactsAbove]:  
I.4)

[CaType]

[MaintypePublicbody]
I.5)

[Mainactivity]

[OtherActivity]:  Fusion Research

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

STEP Design Innovation and Validation of TF Cable Prototype and S Coil Prototype
[Fileref]:  T/CS018/24
II.1.2)

[CpvMain]

73000000  - 
II.1.3)

[TypeContract]

[Services]
II.1.4)

[DescrShort]

The UKAEA Spherical Tokamak for Energy Production (STEP) Confinement Systems team seeks a procurement partner to advance the manufacturing design of its high current density high temperature superconducting cable through an innovation programme structured into several phases. The contract will include hold points to assess satisfactory progress (both schedular and technical) within each phase, prior to proceeding to the next phase.
II.1.6)

[LotsInfo]

[DivisionLots]: [No]
II.2)

[Description]

II.2.2)

[CpvAdditional]

73100000  - 
73300000  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  UK -  UNITED KINGDOM
[MainsiteplaceWorksDelivery]:  
Culham
II.2.4)

[DescrProcurement]

The UKAEA Spherical Tokamak for Energy Production (STEP) Confinement Systems team seeks a procurement partner to advance the manufacturing design of its high current density high temperature superconducting cable through an innovation programme structured into several phases. The contract will include hold points to assess satisfactory progress (both schedular and technical) within each phase, prior to proceeding to the next phase.
II.2.14)

[InfoAdditional]

Please submit your response via the EU supply messaging portal by 12:00 23rd February 2024.
II.3)

[DateOfContractNotice]:

30/03/2024

[Section4]: [Procedure]

IV.1)

[Description]

IV.1.8)

[GpaInfo]

[GpaCovered] : [Yes]
IV.2)

[InfoAdmin]

[Section6]: [InfoComplement]