[FtsS09F06ContractAwardNoticeUtilities]

[Information]

[Published]

[ExternalReference]: 2022-542041

[FtsReference]: 2022-018614

[FtsS09F06ContractAwardNoticeUtilities]

[NoticeAwardUtilities]

[NoticeContractAwardSub]

[Supplies]

[Section1]: [Ce]

I.1)

[NameAddressContact]

United Utilities Water Limited
02366678
Lingley Mere Business Park
Warrington
WA5 3LP
UK
[Contactpoint]: Grace Power
[AddressPhone]: +44 1925678021
[AddressEmail]: grace.power@uuplc.co.uk
[Nutscode]:  UKD -  NORTH WEST (ENGLAND)
[Internets]:
I.6)

[Mainactivity]

[MainactivWater]

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

PRO004428-Goods-Framework-Supply and Delivery of Monitoring and Control Instrumentation
[Fileref]:  Instrumentation
II.1.2)

[CpvMain]

31682210  - 
II.1.3)

[TypeContract]

[Supplies]
II.1.4)

[DescrShort]

The Agreements aim is to ensure that we receive accurate and reliable data from our instruments so that we can monitor the rate, volume and quality of the water and wastewater throughout our sites and networks while providing standardisation and consistency across all of our sites in order to reduce overall costs.
II.1.6)

[LotsInfo]

[DivisionLots]: [Yes]
II.2)

[Description]

II.2.1)

[TitleContract]

pH & Conductivity
[LotNumber]:  1
II.2.2)

[CpvAdditional]

31682210  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  UKD -  NORTH WEST (ENGLAND)
II.2.4)

[DescrProcurement]

The instrument(s) shall be capable of measuring pH in raw water, partially treated water and final treated water in potable water treatment, and in crude sewage, final effluent, mixed liquors and sewage sludge.
II.2.11)

[OptionsInfo]

[Options]: [Yes]
[OptionsDescr]:
2 years initial period plus 6 years of extension (2+1+1+1+1+1+1).
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]
II.2)

[Description]

II.2.1)

[TitleContract]

Chlorine Residual Analysers
[LotNumber]:  2
II.2.2)

[CpvAdditional]

38810000  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  UKD -  NORTH WEST (ENGLAND)
II.2.4)

[DescrProcurement]

The instrument(s) shall be capable of measuring the concentration of free available residual chlorine or total available residual chlorine in partially treated water and final treated water in potable water treatment.
II.2.11)

[OptionsInfo]

[Options]: [Yes]
[OptionsDescr]:
2 years initial period plus 6 years of extension (2+1+1+1+1+1+1)
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]
II.2)

[Description]

II.2.1)

[TitleContract]

Turbidity & Suspended Solids Meters
[LotNumber]:  3
II.2.2)

[CpvAdditional]

38810000  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  UKD -  NORTH WEST (ENGLAND)
II.2.4)

[DescrProcurement]

The instrument(s) shall be capable of measuring the turbidity in raw, partially treated water and final treated water in potable water treatment, and in final effluent in wastewater applications.
The instrument(s) shall be capable of measuring the suspended solids in crude sewage, settled sewage, mixed liquors and final effluent in wastewater applications and clarifier and clarifier desludging applications in water treatment processes.
II.2.11)

[OptionsInfo]

[Options]: [Yes]
[OptionsDescr]:
2 years initial period plus 6 years of extension (2+1+1+1+1+1+1)
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]
II.2)

[Description]

II.2.1)

[TitleContract]

Water Treatment Analysers (Iron, Aluminium & Manganese)
[LotNumber]:  4
II.2.2)

[CpvAdditional]

38810000  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  UKD -  NORTH WEST (ENGLAND)
II.2.4)

[DescrProcurement]

The instrument shall be capable of measuring the concentration of either dissolved or total acid soluble iron, aluminium and manganese in natural waters, and a residual coagulant in partially treated and final potable water.
II.2.11)

[OptionsInfo]

[Options]: [Yes]
[OptionsDescr]:
2 years initial period plus 6 years of extension (2+1+1+1+1+1+1)
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]
II.2)

[Description]

II.2.1)

[TitleContract]

Waste Water Iron Analysers
[LotNumber]:  5
II.2.2)

[CpvAdditional]

38810000  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  UKD -  NORTH WEST (ENGLAND)
II.2.4)

[DescrProcurement]

The instrument shall be capable of measuring the concentration of either dissolved or total acid soluble iron in final effluent in wastewater applications.
II.2.11)

[OptionsInfo]

[Options]: [Yes]
[OptionsDescr]:
2 years initial period plus 6 years of extension (2+1+1+1+1+1+1)
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]
II.2)

[Description]

II.2.1)

[TitleContract]

Dissolved Oxygen Monitors & Sludge Blanket Depth/Interface detectors
[LotNumber]:  6
II.2.2)

[CpvAdditional]

38810000  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  UKD -  NORTH WEST (ENGLAND)
II.2.4)

[DescrProcurement]

The instrument(s) shall be capable of measuring the concentration of dissolved oxygen in sewage plant effluent and in the mixed liquor of an activated sludge plant.
II.2.11)

[OptionsInfo]

[Options]: [Yes]
[OptionsDescr]:
2 years initial period plus 6 years of extension (2+1+1+1+1+1+1)
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]
II.2)

[Description]

II.2.1)

[TitleContract]

Nutrient Analysers
[LotNumber]:  7
II.2.2)

[CpvAdditional]

38810000  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  UKD -  NORTH WEST (ENGLAND)
II.2.4)

[DescrProcurement]

The instrument shall be capable of measuring phosphate or ammonium in crude sewage, settled or partially treated sewage, mixed liquors and final effluent
II.2.11)

[OptionsInfo]

[Options]: [Yes]
[OptionsDescr]:
2 years initial period plus 6 years of extension (2+1+1+1+1+1+1)
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]
II.2)

[Description]

II.2.1)

[TitleContract]

Level Switches – Conductive UV Monitors
[LotNumber]:  8
II.2.2)

[CpvAdditional]

38810000  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  UKD -  NORTH WEST (ENGLAND)
II.2.4)

[DescrProcurement]

Primarily the instrument(s) shall be capable of measuring transmissivity in potable water applications including UV irradiation.
Primarily the instrument(s) shall be capable of measuring transmissivity in waste water treatment applications including UV irradiation.
II.2.11)

[OptionsInfo]

[Options]: [Yes]
[OptionsDescr]:
2 years initial period plus 6 years of extension (2+1+1+1+1+1+1)
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]
II.2)

[Description]

II.2.1)

[TitleContract]

Level Switches – Conductive
[LotNumber]:  9
II.2.2)

[CpvAdditional]

38810000  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  UKD -  NORTH WEST (ENGLAND)
II.2.4)

[DescrProcurement]

The aim of this procurement process is to set up mandatory kit framework agreements with suppliers who are capable of supplying and delivering any number of the 22 monitoring and control instrumentation lots outlined.
The mandatory kit framework agreements will be used by both United Utilities Water (UUW) for replacement equipment, spares and consumables as well as a number of UUW appointed parties who are mandated to engage directly with our kit framework providers to deliver work.
II.2.11)

[OptionsInfo]

[Options]: [Yes]
[OptionsDescr]:
2 years initial period plus 6 years of extension (2+1+1+1+1+1+1)
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]
II.2)

[Description]

II.2.1)

[TitleContract]

Level – Hydrostatic Head
[LotNumber]:  10
II.2.2)

[CpvAdditional]

38810000  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  UKD -  NORTH WEST (ENGLAND)
II.2.4)

[DescrProcurement]

The level transmitter shall be capable of inferring liquid level measurement by means of hydrostatic head in a range of applications ranging from crude sewage to final effluent in wastewater applications and from raw water to potable water in water applications. Instruments will be required for borehole level measurement applications and reservoir depth measurement applications. Applications may include requirements for rod or rope type instrument versions.
II.2.11)

[OptionsInfo]

[Options]: [Yes]
[OptionsDescr]:
2 years initial period plus 6 years of extension (2+1+1+1+1+1+1)
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]
II.2)

[Description]

II.2.1)

[TitleContract]

Level – Ultrasonic
[LotNumber]:  11
II.2.2)

[CpvAdditional]

38810000  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  UKD -  NORTH WEST (ENGLAND)
II.2.4)

[DescrProcurement]

The ultrasonic and radar level measurement transmitters shall be capable of detecting liquid level in a range of applications ranging from crude sewage to final effluent in wastewater applications and from raw water to potable water in water applications. Additionally instruments will be required to monitor chemical level in storage tanks containing a wide range of chemicals found in the water and wastewater treatment processes e.g. Ferric Sulphate, Sulphuric Acid etc.
Open channel flow (by ultrasonic or radar) to be used for flow measurement including for the Company MCerts applications.
II.2.11)

[OptionsInfo]

[Options]: [Yes]
[OptionsDescr]:
2 years initial period plus 6 years of extension (2+1+1+1+1+1+1)
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]
II.2)

[Description]

II.2.1)

[TitleContract]

Level - Radar
[LotNumber]:  12
II.2.2)

[CpvAdditional]

38810000  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  UKD -  NORTH WEST (ENGLAND)
II.2.4)

[DescrProcurement]

The ultrasonic and radar level measurement transmitters shall be capable of detecting liquid level in a range of applications ranging from crude sewage to final effluent in wastewater applications and from raw water to potable water in water applications. Additionally instruments will be required to monitor chemical level in storage tanks containing a wide range of chemicals found in the water and wastewater treatment processes e.g. Ferric Sulphate, Sulphuric Acid etc.
Open channel flow (by ultrasonic or radar) to be used for flow measurement including for the Company MCerts applications.
II.2.11)

[OptionsInfo]

[Options]: [Yes]
[OptionsDescr]:
2 years initial period plus 6 years of extension (2+1+1+1+1+1+1)
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]
II.2)

[Description]

II.2.1)

[TitleContract]

Level - Open Channel
[LotNumber]:  13
II.2.2)

[CpvAdditional]

38810000  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  UKD -  NORTH WEST (ENGLAND)
II.2.4)

[DescrProcurement]

The ultrasonic and radar level measurement transmitters shall be capable of detecting liquid level in a range of applications ranging from crude sewage to final effluent in wastewater applications and from raw water to potable water in water applications. Additionally instruments will be required to monitor chemical level in storage tanks containing a wide range of chemicals found in the water and wastewater treatment processes e.g. Ferric Sulphate, Sulphuric Acid etc.
Open channel flow (by ultrasonic or radar) to be used for flow measurement including for the Company MCerts applications.
II.2.11)

[OptionsInfo]

[Options]: [Yes]
[OptionsDescr]:
2 years initial period plus 6 years of extension (2+1+1+1+1+1+1)
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]
II.2)

[Description]

II.2.1)

[TitleContract]

Electromagnetic Flowmeters
[LotNumber]:  14
II.2.2)

[CpvAdditional]

38810000  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  UKD -  NORTH WEST (ENGLAND)
II.2.4)

[DescrProcurement]

The instrument(s) shall be capable of measuring flow in raw water, partially treated water and final treated water in potable water treatment, and in crude sewage, final effluent and sewage sludge including MCert applications. Instruments are required for chemical dosing applications for a range of chemicals found in the water and wastewater treatment processes.
II.2.11)

[OptionsInfo]

[Options]: [Yes]
[OptionsDescr]:
2 years initial period plus 6 years of extension (2+1+1+1+1+1+1)
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]
II.2)

[Description]

II.2.1)

[TitleContract]

Area Velocity Flowmeters
[LotNumber]:  15
II.2.2)

[CpvAdditional]

38810000  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  UKD -  NORTH WEST (ENGLAND)
II.2.4)

[DescrProcurement]

The instrument(s) shall be capable of measuring flow in raw water, partially treated water and final treated water in potable water treatment, and in crude sewage, final effluent and sewage sludge including MCert applications.
II.2.11)

[OptionsInfo]

[Options]: [Yes]
[OptionsDescr]:
2 years initial period plus 6 years of extension (2+1+1+1+1+1+1)
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]
II.2)

[Description]

II.2.1)

[TitleContract]

Clamp on Flowmeter – Ultrasonic Flow
[LotNumber]:  16
II.2.2)

[CpvAdditional]

38810000  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  UKD -  NORTH WEST (ENGLAND)
II.2.4)

[DescrProcurement]

The instrument(s) shall be capable of measuring flow in raw water, partially treated water and final treated water in potable water treatment, and in crude sewage, final effluent and sewage sludge including MCert applications. The applications may be single sensor applications or multipath sensor arrays, with multiple paths (up to 4) connecting into one signal converter.
II.2.11)

[OptionsInfo]

[Options]: [Yes]
[OptionsDescr]:
2 years initial period plus 6 years of extension (2+1+1+1+1+1+1)
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]
II.2)

[Description]

II.2.1)

[TitleContract]

Thermal Mass Gas Flowmeters
[LotNumber]:  17
II.2.2)

[CpvAdditional]

38810000  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  UKD -  NORTH WEST (ENGLAND)
II.2.4)

[DescrProcurement]

The instrument(s) shall be capable of measuring the mass flow of gasses in wastewater treatment such as air and biogas. These applications can either be closed pipe applications or insertion type.
II.2.11)

[OptionsInfo]

[Options]: [Yes]
[OptionsDescr]:
2 years initial period plus 6 years of extension (2+1+1+1+1+1+1)
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]
II.2)

[Description]

II.2.1)

[TitleContract]

Temperature & Pressure Monitors
[LotNumber]:  18
II.2.2)

[CpvAdditional]

38810000  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  UKD -  NORTH WEST (ENGLAND)
II.2.4)

[DescrProcurement]

The temperature transmitter shall be capable of measuring temperature in a range of applications ranging from crude sewage to final effluent in wastewater applications and from raw water to potable water in water applications
II.2.11)

[OptionsInfo]

[Options]: [Yes]
[OptionsDescr]:
2 years initial period plus 6 years of extension (2+1+1+1+1+1+1)
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]
II.2)

[Description]

II.2.1)

[TitleContract]

MCert Compliant Samplers
[LotNumber]:  19
II.2.2)

[CpvAdditional]

38810000  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  UKD -  NORTH WEST (ENGLAND)
II.2.4)

[DescrProcurement]

Fixed site refrigerated sampler for wastewater and surface water monitoring, with optional multi sample or composite sample bottler systems. Portable sampler required for the same duties.
II.2.11)

[OptionsInfo]

[Options]: [Yes]
[OptionsDescr]:
2 years initial period plus 6 years of extension (2+1+1+1+1+1+1)
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]
II.2)

[Description]

II.2.1)

[TitleContract]

Multivariable Network Quality Analyser
[LotNumber]:  20
II.2.2)

[CpvAdditional]

38810000  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  UKD -  NORTH WEST (ENGLAND)
II.2.4)

[DescrProcurement]

The instrument shall be capable of measuring a number of water quality measures typical to both water treatment and water distribution applications. These may include turbidity, pressure, pH, free chlorine, total chlorine, combined chlorine, conductivity and dissolved oxygen. Sample would be provided to the analyser under pressure.
In each case it is expected that the analyser will be battery powered and provide a range of outputs for connection into a UU specified data logger so that water quality data can be gathered securely from remote locations.
II.2.11)

[OptionsInfo]

[Options]: [Yes]
[OptionsDescr]:
2 years initial period plus 6 years of extension (2+1+1+1+1+1+1)
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]

[Section4]: [Procedure]

IV.1)

[Description]

IV.1.1)

[TypeProcedure]

[ProctypeNegotWCall]
IV.1.3)

[FrameworkContractDpsInfo]

[NoticeInvolvesFramework]
IV.1.8)

[GpaInfo]

[GpaCovered] : [No]
IV.2)

[InfoAdmin]

IV.2.1)

[PubPrevious]

[NumberOj]: 2021/S 000-004822

[Section5]: [AwardOfContract]

[ContractNumber]: 9

[TitleContract]: PRO004428-Goods-Framework-Supply and Delivery of Monitoring and Control Instrumentation

[AwardConfirm]: [Yes]
V.2)

[AwardOfContract]

V.2.1)

[DateAward]

07/04/2022

[Section6]: [InfoComplement]

VI.4)

[AppealsProcedure]

VI.4.1)

[AppealsBody]

High Court of England & Wales
City of Westminster
London
UK

VI.4.2)

[MediationBody]

United Utilities Water Ltd
Warrington
UK

VI.4.4)

[AppealsInfo]

United Utilities Water Ltd
warrington
UK