[FtsS09F02ContractNotice]

[Information]

[Published]

[ExpireDate]: 9/5/2023

[ExternalReference]: 2023-526595

[FtsReference]: 2023-008462

[FtsS09F02ContractNotice]

[NoticeContract]

[Section1]: [Ca]

I.1)

[NameAddressContact]

National Nuclear Laboratory
GB927282900
Chadwick House, Birchwood Park
Warrington
WA3 6AE
UK
[Contactpoint]: Mark Robinson
[AddressPhone]: +44 1925933744
[AddressEmail]: mark.robinson@uknnl.com
[Nutscode]:  UKD -  NORTH WEST (ENGLAND)
[Internets]:
I.2)

[JointProcurement]

[JointProcurementCentral]
I.3)

[InfoTendering]

[AddressObtainDocs]:  
https://uk.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=66641&B=NNL
[AddressFurtherinfo]
[AsContactsAbove]:  
[AddressSendTendersRequest]
[AddressSendTendersRequest]
[AddressToAbove]
I.4)

[CaType]

[MaintypePublicbody]
I.5)

[Mainactivity]

[OtherActivity]:  Nuclear Power Services

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

Design Services Framework
[Fileref]:  NNLC359F
II.1.2)

[CpvMain]

71320000  - 
II.1.3)

[TypeContract]

[Services]
II.1.4)

[DescrShort]

NNL continues to have a requirement for Design Services which it wishes to procure through use of a framework. The framework will consist of four Lots; Lot 1 – Nuclear Design Lot 2 – Nuclear Design and Delivery Lot 3 – Non-Nuclear Design Lot 4 – Non-Nuclear Design and Delivery The aim of these services is to design only or design, manufacture, Works Test and deliver solutions that can be used to build new or modify existing experimental rigs, plant and/or infrastructure in NNL facilities to provide facility improvements, extend plant life and support experimental rigs and processes. The support procured through these Lots may be for a specific Scoped Service or to enhance resources required for self-performed activities. Design may include concept design, preliminary (or scheme) design and detailed design, including design for manufacture.
II.1.6)

[LotsInfo]

[DivisionLots]: [Yes]
[LotsSubmittedFor]  [LotOneOnly]
II.2)

[Description]

II.2.1)

[TitleContract]

Design Services Framework
[LotNumber]:  1
II.2.2)

[CpvAdditional]

45210000  - 
45211350  - 
45213000  - 
45213200  - 
45214600  - 
45214610  - 
45214620  - 
45220000  - 
45222300  - 
45251110  - 
45262600  - 
71220000  - 
71242000  - 
71323200  - 
79415200  - 
79421200  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  UKD -  NORTH WEST (ENGLAND)
II.2.4)

[DescrProcurement]

NNL currently has in place a framework (NNLC085F) for Design Services which is coming to completion in June 2023. NNL continues to have a requirement for Design Services which it wishes to procure through use of a framework. The framework will consist of four Lots; Lot 1 – Nuclear Design Lot 2 – Nuclear Design and Delivery Lot 3 – Non-Nuclear Design Lot 4 – Non-Nuclear Design and Delivery The aim of these services is to design only or design, manufacture, Works Test and deliver solutions that can be used to build new or modify existing experimental rigs, plant and/or infrastructure in NNL facilities to provide facility improvements, extend plant life and support experimental rigs and processes. The support procured through these Lots may be for a specific Scoped Service or to enhance resources required for self-performed activities. Design may include concept design, preliminary (or scheme) design and detailed design, including design for manufacture. Design reviews will be held as appropriate, and HAZOPs may be conducted. The contractor would be expected to support these activities. The design activities require appropriate design quality plans and validation, and verification plans to be produced.
II.2.5)

[AwardCriteria]

[AwardCriteriaDescriptive]
II.2.7)

[DurationContractFrameworkDps]

[DurationMonths]: 48
[RenewalsSubject]: [No]
II.2.10)

[VariantsInfo]

[VariantsAccepted]: [No]
II.2.11)

[OptionsInfo]

[Options]: [No]
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]

[Section3]: [InfoLegal]

III.1)

[ConditionsParticip]

III.1.2)

[EconomicFinancialStanding]

[CriteriaSelectionDocs]
III.1.3)

[TechnicalCapacity]

[CriteriaSelectionDocs]
III.2)

[ConditionsContract]

[Section4]: [Procedure]

IV.1)

[Description]

IV.1.1)

[TypeProcedure]

[ProctypeOpen]
IV.1.3)

[FrameworkContractDpsInfo]

[NoticeInvolvesFramework]
[FrameworkSeveral]
[FrameworkParticipEnvis]:  20
IV.1.8)

[GpaInfo]

[GpaCovered] : [Yes]
IV.2)

[InfoAdmin]

IV.2.2)

[LimitReceiptTendersReqPart]

[Date]:  24/04/2023
[Time]:  16:00
IV.2.4)

[LanguagesAllowed]

[Language_EN]
IV.2.6)

[MinTimeMaintain]

[DurationMonths] : 4  ([FromStatedDate])
IV.2.7)

[OpeningConditions]

[Date]:  24/04/2023
[Time]:  16:00
[OpeningPlace]:  
UK

[Section6]: [InfoComplement]

VI.1)

[RecurrenceInfo]

[RecurrentProcurement]:  [No]
VI.2)

[InfoEworkflow]

[EorderingUsed]
[EinvoicingUsed]
[EpaymentUsed]
VI.4)

[AppealsProcedure]

VI.4.1)

[AppealsBody]

National Nuclear Laboratory Limited
Chadwick House, Birchwood Park
Warrington
WA3 6AE
UK

VI.4.2)

[MediationBody]

The Royal Courts of Justice
The Strand
London
WC2A 2LL
UK

VI.4.4)

[AppealsInfo]

National Nuclear Laboratory
Chadwick House, Birchwood Park
Warrington
WA3 6AE
UK