II.1)
[QuantityScopeContract]
Remodelling and Extension of Wheatley Hill Fire Station
[Fileref]:
51716
[Works]
The existing fire station at Wheatley Hill was completed in in 1989 and requires a comprehensive refurbishment and remodelling including a 41m2 extension. An upgrade to the thermal envelope is included as part of the proposals. The construction value of work required is estimated to be £650,000.
Please refer to the RIBA Stage 3 drawings and information accompanying the SQ.
II.1.5)
[ValueMagnitudeEstimatedTotal]
[ValueExclVat]: 650000.00
GBP
[DivisionLots]:
[No]
II.2.3)
[PlacePerformance]
[Nutscode]:
UKC14 -
Durham CC
II.2.4)
[DescrProcurement]
The existing fire station at Wheatley Hill was completed in in 1989 and requires a comprehensive refurbishment and remodelling including a 41m2 extension. An upgrade to the thermal envelope is included as part of the proposals. The construction value of work required is estimated to be £650,000.
Please refer to the RIBA Stage 3 drawings and information accompanying the SQ.
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 650000.00
GBP
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
7
[RenewalsSubject]:
[No]
[EnvisagedNumber]:
5
[CriteriaChoosingLimited]:
SQ Document
[VariantsAccepted]:
[No]
[Options]:
[No]
[EuProgrRelated]:
[No]