[FtsS09F02ContractNotice]

[Information]

[Published]

[ExpireDate]: 27/08/2021

[ExternalReference]: 2021-533232

[FtsReference]: 2021-016125

[FtsS09F02ContractNotice]

[NoticeContract]

[Section1]: [Ca]

I.1)

[NameAddressContact]

United Kingdom Atomic Energy Authority
N/A
Culham Science Centre
Abingdon
OX14 3DB
UK
[Contactpoint]: Abigail Woods
[AddressEmail]: abigail.woods@ukaea.uk
[Nutscode]:  UKJ1 -  Berkshire, Buckinghamshire and Oxfordshire
[Internets]:
I.3)

[InfoTendering]

[AddressObtainDocs]:  
https://uk.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=38731&B=UK
[AddressFurtherinfo]
[AsContactsAbove]:  
[AddressSendTendersRequest]
[AddressSendTendersRequest]
[AddressToAbove]
I.4)

[CaType]

[MaintypePublicbody]
I.5)

[Mainactivity]

[OtherActivity]:  Fusion Research

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

H3AT Isotope Separation System
[Fileref]:  T/AW109/21
II.1.2)

[CpvMain]

42123300  - 
II.1.3)

[TypeContract]

[Supplies]
II.1.4)

[DescrShort]

The Isotope Separation System (ISS) is a sub-system of the H3AT Facility ITER-like Tritium Loop, designed to separate hydrogen isotope gas mixtures by cryogenic distillation. It will take mixed hydrogen isotopes from the Hydrogen Purification System and protium from the Water Detritiation system, to produce isotope streams to suit ITER, DEMO and H3AT research requirements. This sub-system will feed tritium and deuterium to the Storage and Distribution System and protium to the Water Detritation System. This system will comprise 4 cryogenic distillation columns, cold box, valve box, packed bed reactors (equilibriators), expansion vessels and refrigeration plant.
II.1.5)

[ValueMagnitudeEstimatedTotal]

[ValueExclVat]: 5800000.00  GBP
II.1.6)

[LotsInfo]

[DivisionLots]: [No]
II.2)

[Description]

II.2.2)

[CpvAdditional]

42123300  - 
42510000  - 
42511000  - 
42511100  - 
42511110  - 
42511200  - 
42910000  - 
51100000  - 
51110000  - 
51112000  - 
51112100  - 
51112200  - 
51120000  - 
51230000  - 
51430000  - 
51500000  - 
51510000  - 
51800000  - 
51810000  - 
71300000  - 
71320000  - 
71323000  - 
71330000  - 
71333000  - 
71334000  - 
71335000  - 
71336000  - 
71340000  - 
71350000  - 
73000000  - 
73100000  - 
73300000  - 
73430000  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  UKJ1 -  Berkshire, Buckinghamshire and Oxfordshire
II.2.4)

[DescrProcurement]

The Isotope Separation System (ISS) is a sub-system of the H3AT Facility ITER-like Tritium Loop, designed to separate hydrogen isotope gas mixtures by cryogenic distillation. It will take mixed hydrogen isotopes from the Hydrogen Purification System and protium from the Water Detritiation system, to produce isotope streams to suit ITER, DEMO and H3AT research requirements. This sub-system will feed tritium and deuterium to the Storage and Distribution System and protium to the Water Detritation System. This system will comprise 4 cryogenic distillation columns, cold box, valve box, packed bed reactors (equilibriators), expansion vessels and refrigeration plant.
II.2.5)

[AwardCriteria]

[AwardCriteriaDescriptive]
II.2.6)

[ValueMagnitudeEstimated]

[ValueExclVat]: 5800000.00  GBP
II.2.7)

[DurationContractFrameworkDps]

[Starting]: 13-8-2021  /  [End]: 31-12-2021
[RenewalsSubject]: [No]
II.2.10)

[VariantsInfo]

[VariantsAccepted]: [No]
II.2.11)

[OptionsInfo]

[Options]: [No]
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]

[Section3]: [InfoLegal]

III.1)

[ConditionsParticip]

III.1.1)

[SituationPersonalIncl]

[InfoEvaluatingRequir]:  Refer to Procurement Documents for information.
III.1.2)

[EconomicFinancialStanding]

[InfoEvaluatingWethRequir]:  
Refer to Procurement Documents for information.
[MinStandardsRequired]:  
Refer to Procurement Documents for information.
III.1.3)

[TechnicalCapacity]

[InfoEvaluatingWethRequir]:  
Refer to Procurement Documents for information.
[MinStandardsRequired]:  
Refer to Procurement Documents for information.
III.2)

[ConditionsContract]

III.2.2)

[OtherConditions]

Refer to Procurement Documents for information.

[Section4]: [Procedure]

IV.1)

[Description]

IV.1.1)

[TypeProcedure]

[ProctypeInnovation]
IV.1.8)

[GpaInfo]

[GpaCovered] : [No]
IV.2)

[InfoAdmin]

IV.2.2)

[LimitReceiptTendersReqPart]

[Date]:  13-8-2021
[Time]:  12:00
IV.2.4)

[LanguagesAllowed]

[Language_EN]
IV.2.6)

[MinTimeMaintain]

[DateTenderValid]:  30-4-2022

[Section6]: [InfoComplement]

VI.1)

[RecurrenceInfo]

[RecurrentProcurement]:  [No]
VI.4)

[AppealsProcedure]

VI.4.1)

[AppealsBody]

UK Atomic Energy Authority
Culham Science Centre
Abingdon
OX14 3DB
UK

VI.4.2)

[MediationBody]

UK Atomic Energy Authority
Culham Science Centre
Abingdon
OX14 3DB
UK

VI.4.3)

[AppealsLodging]

[AppealsDeadline]: 
VI.4.2)Body responsible for mediation procedures
VI.4.3)Review procedure
Precise information on deadline(s) for review procedures:
The authority will incorporate a minimum 10 calendar day standstill period at the point information on the award of the contract is communicated to tenderers.
This period allows unsuccessful tenderers to seek further debriefing from the authority before a contract is entered into applicants have 2 working days from the notification of the award decision to request. Additional debriefing and that information have to be provided within a minimum of 3 working days before the expiry of the standstill period. Such additional information should be sought from the contact named in this notice.
If an appeal regarding the award of a contract has not been successfully resolved, the Public Contracts Regulations 2015 (SI 2015 No. 102) provide for aggrieved parties who have been harmed or are at risk of harm by a breach of the rules to take action in the High Court (England, Wales and Northern Ireland).
Any such action must be brought promptly.
(generally within 3 months).
VI.4.4)

[AppealsInfo]

UK Atomic Energy Authority
Culham Science Centre
Abingdon
OX14 3DB
UK