[FtsS09F02ContractNotice]

[Information]

[Published]

[ExpireDate]: 17/06/2021

[ExternalReference]: 2021-512770

[FtsReference]: 2021-009784

[FtsS09F02ContractNotice]

[NoticeContract]

[Section1]: [Ca]

I.1)

[NameAddressContact]

London Borough of Camden
n/a
5 Pancras Square
London
N1C 4AG
UK
[Contactpoint]: Roopam Bhachu
[AddressPhone]: +44 02079746384
[Nutscode]:  UKI -  LONDON
[Internets]:
[UrlGeneral]: www.camden.gov.uk

I.3)

[InfoTendering]

[AddressObtainDocs]:  
https://uk.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=37754&B=LBCAMDEN
[AddressFurtherinfo]
[AsContactsAbove]:  
[AddressSendTendersRequest]
[AddressSendTendersRequest]
[AddressToAbove]
I.4)

[CaType]

[MaintypeLocalauth]
I.5)

[Mainactivity]

[MainactivGeneral]

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

Bray, Burnham, Dorney, Taplow Towers Major Works Project
[Fileref]:  EU Supply Tender Reference: 44355
II.1.2)

[CpvMain]

45262650  - 
II.1.3)

[TypeContract]

[Works]
II.1.4)

[DescrShort]

The London Borough of Camden (‘the Council’) is seeking to award a contract for recladding works to the Bray, Burnham, Dorney and Taplow towers, together with associated works to the envelope of the buildings, including full window replacement, renewal of flat roofs, installation of building maintenance units (BMU), replacement of brickwork to the ground and first floor levels, including vents, louvers and canopies as well as insulation to the undercroft as required. Related works will include radiator installations, internal making good and decorating as well as installation of relevant power supplies to BMUs and louvers.
The project will comprise of the replacement of the previous cladding system, which has been removed, the curtain walling, associated remedial work and making good, and window replacement throughout. The total façade area is approximately 30,000m2.
Construction Duration: 22 to 25 months
II.1.5)

[ValueMagnitudeEstimatedTotal]

[ValueExclVat]: 100000000.00  GBP
II.1.6)

[LotsInfo]

[DivisionLots]: [No]
II.2)

[Description]

II.2.2)

[CpvAdditional]

44221100  - 
45261910  - 
45262520  - 
45421132  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  UKI -  LONDON
[MainsiteplaceWorksDelivery]:  
Chalcots Estate
II.2.4)

[DescrProcurement]

The scope of the major works are detailed in the technical specification and can be summarised as follows: The London Borough of Camden (‘the Council’) is seeking to award a contract for recladding works to the Bray, Burnham, Dorney and Taplow towers, together with associated works to the envelope of the buildings, including full window replacement, renewal of flat roofs, installation of building maintenance units (BMU), replacement of brickwork to the ground and first floor levels, including vents, louvers and canopies as well as insulation to the undercroft as required. Related works will include radiator installations, internal making good and decorating as well as installation of relevant power supplies to BMUs and louvers.
The project will comprise of the replacement of the previous cladding system, which has been removed, the curtain walling, associated remedial work and making good, and window replacement throughout. The total façade area is approximately 30,000m2.
Construction Duration: 22 to 25 months
II.2.5)

[AwardCriteria]

[AwardCriteriaDescriptive]
II.2.7)

[DurationContractFrameworkDps]

[DurationMonths]: 25
[RenewalsSubject]: [No]
II.2.9)

[LimitOperators]

[EnvisagedNumber]: 6
II.2.10)

[VariantsInfo]

[VariantsAccepted]: [No]
II.2.11)

[OptionsInfo]

[Options]: [No]
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]

[Section3]: [InfoLegal]

III.1)

[ConditionsParticip]

III.1.2)

[EconomicFinancialStanding]

[CriteriaSelectionDocs]
III.1.3)

[TechnicalCapacity]

[CriteriaSelectionDocs]
III.2)

[ConditionsContract]

[Section4]: [Procedure]

IV.1)

[Description]

IV.1.1)

[TypeProcedure]

[ProctypeRestricted]
IV.1.8)

[GpaInfo]

[GpaCovered] : [Yes]
IV.2)

[InfoAdmin]

IV.2.2)

[LimitReceiptTendersReqPart]

[Date]:  17/06/2021
[Time]:  12:00
IV.2.3)

[DateDispatchTenderParticipate]

[Date]: 16/07/2021
IV.2.4)

[LanguagesAllowed]

[Language_EN]
IV.2.6)

[MinTimeMaintain]

[DurationMonths] : 3  ([FromStatedDate])

[Section6]: [InfoComplement]

VI.1)

[RecurrenceInfo]

[RecurrentProcurement]:  [No]
VI.4)

[AppealsProcedure]

VI.4.1)

[AppealsBody]

Cabinet Office
London
UK