[FtsS09F14Corrigendum]

[Information]

[Published]

[ExternalReference]: 2025-575804

[FtsReference]: 2025-006126

[FtsS09F14Corrigendum]

[NoticeCorrigendum]

[NoticeCorrigendumSub]

[Services]

[Section1]: [CaCe]

I.1)

[NameAddressContact]

KBS Maritime Ltd
13289372
Victory Building, Room 233, The Parade, HM Naval Base
Portsmouth
PO1 3LS
UK
[Nutscode]:  UKJ31 -  Portsmouth
[Internets]:

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

Site Wide Lightning Protection Risk Assessment
[Fileref]:  TXN0042-01
II.1.2)

[CpvMain]

90711100  - 
II.1.3)

[TypeContract]

[Services]
II.1.4)

[DescrShort]

The requirements for this project include conducting a feasibility study to assess the condition of the existing lightning protection systems where installed and undertake a lightning protection risk assessment of the whole site to determine the potential for lightning strikes in accordance with BS EN 62305. And BS 7430+A.
The Lightning Protection investigations and reporting shall be carried out by ‘competent persons’ and or Company must be an affiliated to ATLAS and who shall meet the relevant experience and qualifications to produce comprehensively the requirements.

[Section6]: [InfoComplement]

VI.6)

[IcarOriginalRef]

[NumberOj]: 2025/S 000-003883

[Section7]: [Changes]

VII.1)

[IcarCorrectAdd]

VII.1.2)

[IcarTextCorrected]

[SectionNo]:  IV.2.2
[IcarInstead]:  
[Date]:  24/02/2025
[Time]:  12:00
[IcarRead]:  
[Date]:  28/02/2025
[Time]:  12:00