Construction Works (up to £5m) North England & North Wales
[LotNumber]:
1a
45000000
-
51000000
-
09300000
-
09331000
-
09332000
-
42511110
-
44621110
-
45232141
-
45315000
-
45331100
-
71321200
-
45311100
-
42943210
-
45331000
-
45331200
-
45331210
-
44112600
-
45261410
-
45321000
-
45323000
-
45421100
-
45421110
-
45421112
-
45421130
-
45421132
-
42515000
-
44621000
-
44621200
-
44621210
-
44621220
-
45331110
-
45262100
-
II.2.3)
[PlacePerformance]
[Nutscode]:
UKL23 -
Flintshire and Wrexham
[Nutscode]:
UKL13 -
Conwy and Denbighshire
[Nutscode]:
UKL12 -
Gwynedd
[Nutscode]:
UKL11 -
Isle of Anglesey
[Nutscode]:
UKE4 -
West Yorkshire
[Nutscode]:
UKE3 -
South Yorkshire
[Nutscode]:
UKE2 -
North Yorkshire
[Nutscode]:
UKE1 -
East Yorkshire and Northern Lincolnshire
[Nutscode]:
UKE -
YORKSHIRE AND THE HUMBER
[Nutscode]:
UKD7 -
Merseyside
[Nutscode]:
UKD6 -
Cheshire
[Nutscode]:
UKD4 -
Lancashire
[Nutscode]:
UKD3 -
Greater Manchester
[Nutscode]:
UKD1 -
Cumbria
[Nutscode]:
UKD -
NORTH WEST (ENGLAND)
[Nutscode]:
UKC2 -
Northumberland and Tyne and Wear
[Nutscode]:
UKC1 -
Tees Valley and Durham
[Nutscode]:
UKC -
NORTH EAST (ENGLAND)
II.2.4)
[DescrProcurement]
Lot 1a will cover Decarbonisation Construction works up to £5m in North England and North Wales.
Work under this Lot 1 could include Solar PV and Battery, Heat Pumps, Electric Heaters, Heat and Hot Water Controller, Mechanical Extract, Solid Floor Insulation, Low Energy, Lighting, Internal Wall Insulation, Suspended Floor Insulation, Loft Insulation, Cavity Wall Insulation, Pitched Roof Insulation, Flat Roof Insulation, Windows, Front Doors, Hydrogen Boilers, Gas Boilers, Biomass, Combined Heating and Power and External Wall Insulation.
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 105000000.00
GBP
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
84
[RenewalsSubject]:
[No]
[VariantsAccepted]:
[No]
[Options]:
[Yes]
[OptionsDescr]:
The framework includes an option to extend for a further 3 years beyond the initial 4 year term to align with the Government target of 2030 for retrofit and decarbonisation work.
[EuProgrRelated]:
[No]
Construction Works (up to £5m) Midlands and Mid Wales
[LotNumber]:
1b
51000000
-
09300000
-
09331000
-
09332000
-
42511110
-
44621110
-
45232141
-
45315000
-
45331100
-
71321200
-
45311100
-
42943210
-
45331000
-
45331200
-
45331210
-
44112600
-
45261410
-
45321000
-
45323000
-
45421100
-
45421110
-
45421112
-
45421130
-
42515000
-
44621000
-
44621200
-
44621210
-
44621220
-
45331110
-
45262100
-
II.2.3)
[PlacePerformance]
[Nutscode]:
UKL24 -
Powys
[Nutscode]:
UKL15 -
Central Valleys
[Nutscode]:
UKG3 -
West Midlands
[Nutscode]:
UKG2 -
Shropshire and Staffordshire
[Nutscode]:
UKG1 -
Herefordshire, Worcestershire and Warwickshire
[Nutscode]:
UKG -
WEST MIDLANDS (ENGLAND)
[Nutscode]:
UKF3 -
Lincolnshire
[Nutscode]:
UKF2 -
Leicestershire, Rutland and Northamptonshire
[Nutscode]:
UKF1 -
Derbyshire and Nottinghamshire
[Nutscode]:
UKF -
EAST MIDLANDS (ENGLAND)
II.2.4)
[DescrProcurement]
Lot 1b will cover Decarbonisation Construction works up to £5m in the Midlands and Central Wales.
Work under this could include Solar PV and Battery, Heat Pumps, Electric Heaters, Heat and Hot Water Controller, Mechanical Extract, Solid Floor Insulation, Low Energy, Lighting, Internal Wall Insulation, Suspended Floor Insulation, Loft Insulation, Cavity Wall Insulation, Pitched Roof Insulation, Flat Roof Insulation, Windows, Front Doors, Hydrogen Boilers, Gas Boilers, Biomass, Combined Heating and Power and External Wall Insulation.
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 70000000.00
GBP
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
84
[RenewalsSubject]:
[No]
[VariantsAccepted]:
[No]
[Options]:
[Yes]
[OptionsDescr]:
The framework includes an option to extend for a further 3 years beyond the initial 4 year term to align with the Government target of 2030 for retrofit and decarbonisation work.
[EuProgrRelated]:
[No]
Construction Works (up to £5m) South West England and South Wales
[LotNumber]:
1c
51000000
-
09300000
-
09331000
-
09332000
-
42511110
-
44621110
-
45232141
-
45315000
-
45331100
-
45311100
-
42943210
-
45331000
-
45331200
-
45331210
-
44112600
-
45261410
-
45321000
-
45323000
-
45421100
-
45421110
-
45421112
-
45421130
-
45421132
-
42515000
-
44621000
-
44621200
-
44621210
-
44621220
-
45331110
-
45262100
-
II.2.3)
[PlacePerformance]
[Nutscode]:
UKL22 -
Cardiff and Vale of Glamorgan
[Nutscode]:
UKL21 -
Monmouthshire and Newport
[Nutscode]:
UKL18 -
Swansea
[Nutscode]:
UKL17 -
Bridgend and Neath Port Talbot
[Nutscode]:
UKL16 -
Gwent Valleys
[Nutscode]:
UKL14 -
South West Wales
[Nutscode]:
UKK4 -
Devon
[Nutscode]:
UKK3 -
Cornwall and Isles of Scilly
[Nutscode]:
UKK2 -
Dorset and Somerset
[Nutscode]:
UKK1 -
Gloucestershire, Wiltshire and Bristol/Bath area
[Nutscode]:
UKK -
SOUTH WEST (ENGLAND)
II.2.4)
[DescrProcurement]
Lot 1c will cover Decarbonisation Construction works up to £5m in South West England and South Wales.
Work under this could include Solar PV and Battery, Heat Pumps, Electric Heaters, Heat and Hot Water Controller, Mechanical Extract, Solid Floor Insulation, Low Energy, Lighting, Internal Wall Insulation, Suspended Floor Insulation, Loft Insulation, Cavity Wall Insulation, Pitched Roof Insulation, Flat Roof Insulation, Windows, Front Doors, Hydrogen Boilers, Gas Boilers, Biomass, Combined Heating and Power and External Wall Insulation.
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 42000000.00
GBP
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
84
[RenewalsSubject]:
[No]
[VariantsAccepted]:
[No]
[Options]:
[Yes]
[OptionsDescr]:
The framework includes an option to extend for a further 3 years beyond the initial 4 year term to align with the Government target of 2030 for retrofit and decarbonisation work.
[EuProgrRelated]:
[No]
Construction Works (up to £5m) South and East England
[LotNumber]:
1d
51000000
-
09300000
-
09331000
-
09332000
-
42511110
-
44621110
-
45232141
-
45315000
-
45331100
-
71321200
-
45311100
-
42943210
-
45331000
-
45331200
-
45331210
-
44112600
-
45261410
-
45321000
-
45323000
-
45421100
-
45421110
-
45421112
-
45421130
-
45421132
-
42515000
-
44621000
-
44621200
-
44621210
-
44621220
-
45331110
-
45262100
-
II.2.3)
[PlacePerformance]
[Nutscode]:
UKJ4 -
Kent
[Nutscode]:
UKJ3 -
Hampshire and Isle of Wight
[Nutscode]:
UKJ2 -
Surrey, East and West Sussex
[Nutscode]:
UKJ1 -
Berkshire, Buckinghamshire and Oxfordshire
[Nutscode]:
UKJ -
SOUTH EAST (ENGLAND)
[Nutscode]:
UKH3 -
Essex
[Nutscode]:
UKH2 -
Bedfordshire and Hertfordshire
[Nutscode]:
UKH1 -
East Anglia
[Nutscode]:
UKH -
EAST OF ENGLAND
II.2.4)
[DescrProcurement]
Lot 1d will cover Decarbonisation Construction works up to £5m in South and East England.
Work under this lot could include Solar PV and Battery, Heat Pumps, Electric Heaters, Heat and Hot Water Controller, Mechanical Extract, Solid Floor Insulation, Low Energy, Lighting, Internal Wall Insulation, Suspended Floor Insulation, Loft Insulation, Cavity Wall Insulation, Pitched Roof Insulation, Flat Roof Insulation, Windows, Front Doors, Hydrogen Boilers, Gas Boilers, Biomass, Combined Heating and Power and External Wall Insulation.
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 140000000.00
GBP
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
84
[RenewalsSubject]:
[No]
[VariantsAccepted]:
[No]
[Options]:
[Yes]
[OptionsDescr]:
The framework includes an option to extend for a further 3 years beyond the initial 4 year term to align with the Government target of 2030 for retrofit and decarbonisation work.
[EuProgrRelated]:
[No]
Construction Works (up to £5m) London
[LotNumber]:
1e
51000000
-
09300000
-
09331000
-
09332000
-
42511110
-
44621110
-
45232141
-
45315000
-
45331100
-
45311100
-
42943210
-
45331000
-
45331200
-
45331210
-
44112600
-
45261410
-
45321000
-
45323000
-
45421100
-
45421110
-
45421112
-
45421130
-
45421132
-
42515000
-
44621000
-
44621200
-
44621210
-
44621220
-
45331110
-
45262100
-
II.2.3)
[PlacePerformance]
[Nutscode]:
UKI7 -
Outer London – West and North West
[Nutscode]:
UKI6 -
Outer London – South
[Nutscode]:
UKI5 -
Outer London – East and North East
[Nutscode]:
UKI4 -
Inner London – East
[Nutscode]:
UKI3 -
Inner London – West
[Nutscode]:
UKI -
LONDON
II.2.4)
[DescrProcurement]
Lot 1e will cover Decarbonisation Construction works up to £5m in London.
Work under this Lot could include Solar PV and Battery, Heat Pumps, Electric Heaters, Heat and Hot Water Controller, Mechanical Extract, Solid Floor Insulation, Low Energy, Lighting, Internal Wall Insulation, Suspended Floor Insulation, Loft Insulation, Cavity Wall Insulation, Pitched Roof Insulation, Flat Roof Insulation, Windows, Front Doors, Hydrogen Boilers, Gas Boilers, Biomass, Combined Heating and Power and External Wall Insulation.
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 112000000.00
GBP
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
84
[RenewalsSubject]:
[No]
[VariantsAccepted]:
[No]
[Options]:
[Yes]
[OptionsDescr]:
The framework includes an option to extend for a further 3 years beyond the initial 4 year term to align with the Government target of 2030 for retrofit and decarbonisation work.
[EuProgrRelated]:
[No]
Construction Works (over £2m) North England and North Wales
[LotNumber]:
2a
51000000
-
09300000
-
09331000
-
09332000
-
42511110
-
44621110
-
45232141
-
45315000
-
45331100
-
45311100
-
42943210
-
45331000
-
45331200
-
45331210
-
44112600
-
45261410
-
45321000
-
45323000
-
45421100
-
45421110
-
45421112
-
45421130
-
45421132
-
42515000
-
44621000
-
44621200
-
44621210
-
44621220
-
45331110
-
45262100
-
II.2.3)
[PlacePerformance]
[Nutscode]:
UKL23 -
Flintshire and Wrexham
[Nutscode]:
UKL13 -
Conwy and Denbighshire
[Nutscode]:
UKL12 -
Gwynedd
[Nutscode]:
UKL11 -
Isle of Anglesey
[Nutscode]:
UKE4 -
West Yorkshire
[Nutscode]:
UKE3 -
South Yorkshire
[Nutscode]:
UKE2 -
North Yorkshire
[Nutscode]:
UKE1 -
East Yorkshire and Northern Lincolnshire
[Nutscode]:
UKE -
YORKSHIRE AND THE HUMBER
[Nutscode]:
UKD7 -
Merseyside
[Nutscode]:
UKD6 -
Cheshire
[Nutscode]:
UKD4 -
Lancashire
[Nutscode]:
UKD3 -
Greater Manchester
[Nutscode]:
UKD1 -
Cumbria
[Nutscode]:
UKD -
NORTH WEST (ENGLAND)
[Nutscode]:
UKC2 -
Northumberland and Tyne and Wear
[Nutscode]:
UKC1 -
Tees Valley and Durham
[Nutscode]:
UKC -
NORTH EAST (ENGLAND)
II.2.4)
[DescrProcurement]
Lot 2a will cover Decarbonisation Construction works over £2m in North England and North Wales.
Work under this lot could include Solar PV and Battery, Heat Pumps, Electric Heaters, Heat and Hot Water Controller, Mechanical Extract, Solid Floor Insulation, Low Energy, Lighting, Internal Wall Insulation, Suspended Floor Insulation, Loft Insulation, Cavity Wall Insulation, Pitched Roof Insulation, Flat Roof Insulation, Windows, Front Doors, Hydrogen Boilers, Gas Boilers, Biomass, Combined Heating and Power and External Wall Insulation.
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 210000000.00
GBP
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
84
[RenewalsSubject]:
[No]
[VariantsAccepted]:
[No]
[Options]:
[Yes]
[OptionsDescr]:
The framework includes an option to extend for a further 3 years beyond the initial 4 year term to align with the Government target of 2030 for retrofit and decarbonisation work.
[EuProgrRelated]:
[No]
Construction Works (over £2m) Midlands and Mid Wales
[LotNumber]:
2b
51000000
-
09300000
-
09331000
-
09332000
-
42511110
-
44621110
-
45232141
-
45315000
-
45331100
-
45311100
-
42943210
-
45331000
-
45331200
-
45331210
-
44112600
-
45261410
-
45321000
-
45323000
-
45421100
-
45421110
-
45421112
-
45421130
-
45421132
-
42515000
-
44621000
-
44621200
-
44621210
-
44621220
-
45331110
-
45262100
-
II.2.3)
[PlacePerformance]
[Nutscode]:
UKL24 -
Powys
[Nutscode]:
UKL15 -
Central Valleys
[Nutscode]:
UKG3 -
West Midlands
[Nutscode]:
UKG2 -
Shropshire and Staffordshire
[Nutscode]:
UKG1 -
Herefordshire, Worcestershire and Warwickshire
[Nutscode]:
UKG -
WEST MIDLANDS (ENGLAND)
[Nutscode]:
UKF3 -
Lincolnshire
[Nutscode]:
UKF2 -
Leicestershire, Rutland and Northamptonshire
[Nutscode]:
UKF1 -
Derbyshire and Nottinghamshire
[Nutscode]:
UKF -
EAST MIDLANDS (ENGLAND)
II.2.4)
[DescrProcurement]
Lot 2b will cover Decarbonisation Construction works over £2m in Midlands and Central Wales.
Work under this lot could include Solar PV and Battery, Heat Pumps, Electric Heaters, Heat and Hot Water Controller, Mechanical Extract, Solid Floor Insulation, Low Energy, Lighting, Internal Wall Insulation, Suspended Floor Insulation, Loft Insulation, Cavity Wall Insulation, Pitched Roof Insulation, Flat Roof Insulation, Windows, Front Doors, Hydrogen Boilers, Gas Boilers, Biomass, Combined Heating and Power and External Wall Insulation.
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 140000000.00
GBP
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
84
[RenewalsSubject]:
[No]
[VariantsAccepted]:
[No]
[Options]:
[Yes]
[OptionsDescr]:
The framework includes an option to extend for a further 3 years beyond the initial 4 year term to align with the Government target of 2030 for retrofit and decarbonisation work.
[EuProgrRelated]:
[No]
Construction Works (over £2m) South West England and South Wales
[LotNumber]:
2c
51000000
-
09300000
-
09331000
-
09332000
-
42511110
-
44621110
-
45232141
-
45315000
-
45331100
-
45311100
-
42943210
-
45331000
-
45331200
-
45331210
-
44112600
-
45261410
-
45321000
-
45323000
-
45421100
-
45421110
-
45421112
-
45421130
-
45421132
-
42515000
-
44621000
-
44621200
-
44621210
-
44621220
-
45331110
-
45262100
-
II.2.3)
[PlacePerformance]
[Nutscode]:
UKL22 -
Cardiff and Vale of Glamorgan
[Nutscode]:
UKL21 -
Monmouthshire and Newport
[Nutscode]:
UKL18 -
Swansea
[Nutscode]:
UKL17 -
Bridgend and Neath Port Talbot
[Nutscode]:
UKL16 -
Gwent Valleys
[Nutscode]:
UKL14 -
South West Wales
[Nutscode]:
UKK4 -
Devon
[Nutscode]:
UKK3 -
Cornwall and Isles of Scilly
[Nutscode]:
UKK2 -
Dorset and Somerset
[Nutscode]:
UKK1 -
Gloucestershire, Wiltshire and Bristol/Bath area
[Nutscode]:
UKK -
SOUTH WEST (ENGLAND)
II.2.4)
[DescrProcurement]
Lot 2c will cover Decarbonisation Construction works over £2m in South West England and South Wales.
Work under this lot could include Solar PV and Battery, Heat Pumps, Electric Heaters, Heat and Hot Water Controller, Mechanical Extract, Solid Floor Insulation, Low Energy, Lighting, Internal Wall Insulation, Suspended Floor Insulation, Loft Insulation, Cavity Wall Insulation, Pitched Roof Insulation, Flat Roof Insulation, Windows, Front Doors, Hydrogen Boilers, Gas Boilers, Biomass, Combined Heating and Power and External Wall Insulation.
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 84000000.00
GBP
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
84
[RenewalsSubject]:
[No]
[VariantsAccepted]:
[No]
[Options]:
[Yes]
[OptionsDescr]:
The framework includes an option to extend for a further 3 years beyond the initial 4 year term to align with the Government target of 2030 for retrofit and decarbonisation work.
[EuProgrRelated]:
[No]
Construction Works (over £2m) South and East England
[LotNumber]:
2d
51000000
-
09300000
-
09331000
-
09332000
-
42511110
-
44621110
-
45232141
-
45315000
-
45331100
-
45311100
-
42943210
-
45331000
-
45331200
-
45331210
-
44112600
-
45261410
-
45321000
-
45323000
-
45421100
-
45421110
-
45421112
-
45421130
-
45421132
-
42515000
-
44621000
-
44621200
-
44621210
-
44621220
-
45331110
-
45262100
-
II.2.3)
[PlacePerformance]
[Nutscode]:
UKJ4 -
Kent
[Nutscode]:
UKJ3 -
Hampshire and Isle of Wight
[Nutscode]:
UKJ2 -
Surrey, East and West Sussex
[Nutscode]:
UKJ1 -
Berkshire, Buckinghamshire and Oxfordshire
[Nutscode]:
UKH3 -
Essex
[Nutscode]:
UKH2 -
Bedfordshire and Hertfordshire
[Nutscode]:
UKH1 -
East Anglia
[Nutscode]:
UKH -
EAST OF ENGLAND
II.2.4)
[DescrProcurement]
Lot 2d will cover Decarbonisation Construction works over £2m in South and East England.
Work under this lot could include Solar PV and Battery, Heat Pumps, Electric Heaters, Heat and Hot Water Controller, Mechanical Extract, Solid Floor Insulation, Low Energy, Lighting, Internal Wall Insulation, Suspended Floor Insulation, Loft Insulation, Cavity Wall Insulation, Pitched Roof Insulation, Flat Roof Insulation, Windows, Front Doors, Hydrogen Boilers, Gas Boilers, Biomass, Combined Heating and Power and External Wall Insulation.
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 280000000.00
GBP
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
84
[RenewalsSubject]:
[No]
[VariantsAccepted]:
[No]
[Options]:
[Yes]
[OptionsDescr]:
The framework includes an option to extend for a further 3 years beyond the initial 4 year term to align with the Government target of 2030 for retrofit and decarbonisation work.
[EuProgrRelated]:
[No]
Construction Works (over £2m) London
[LotNumber]:
2e
51000000
-
09300000
-
09331000
-
09332000
-
42511110
-
44621110
-
45232141
-
45315000
-
45331100
-
45311100
-
42943210
-
45331000
-
45331200
-
45331210
-
44112600
-
45261410
-
45321000
-
45323000
-
45421100
-
45421110
-
45421112
-
45421130
-
45421132
-
42515000
-
44621000
-
44621200
-
44621210
-
44621220
-
45331110
-
45262100
-
II.2.3)
[PlacePerformance]
[Nutscode]:
UKI7 -
Outer London – West and North West
[Nutscode]:
UKI6 -
Outer London – South
[Nutscode]:
UKI5 -
Outer London – East and North East
[Nutscode]:
UKI4 -
Inner London – East
[Nutscode]:
UKI3 -
Inner London – West
[Nutscode]:
UKI -
LONDON
II.2.4)
[DescrProcurement]
Lot 2e will cover Decarbonisation Construction works over £2m in London.
Work under this lot could include Solar PV and Battery, Heat Pumps, Electric Heaters, Heat and Hot Water Controller, Mechanical Extract, Solid Floor Insulation, Low Energy, Lighting, Internal Wall Insulation, Suspended Floor Insulation, Loft Insulation, Cavity Wall Insulation, Pitched Roof Insulation, Flat Roof Insulation, Windows, Front Doors, Hydrogen Boilers, Gas Boilers, Biomass, Combined Heating and Power and External Wall Insulation.
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 224000000.00
GBP
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
84
[RenewalsSubject]:
[No]
[VariantsAccepted]:
[No]
[Options]:
[Yes]
[OptionsDescr]:
The framework includes an option to extend for a further 3 years beyond the initial 4 year term to align with the Government target of 2030 for retrofit and decarbonisation work.
[EuProgrRelated]:
[No]
Consultancy Work - North England and North Wales
[LotNumber]:
3a
71314300
-
71315200
-
71321400
-
71321200
-
II.2.3)
[PlacePerformance]
[Nutscode]:
UKL23 -
Flintshire and Wrexham
[Nutscode]:
UKL13 -
Conwy and Denbighshire
[Nutscode]:
UKL12 -
Gwynedd
[Nutscode]:
UKL11 -
Isle of Anglesey
[Nutscode]:
UKD7 -
Merseyside
[Nutscode]:
UKD6 -
Cheshire
[Nutscode]:
UKD4 -
Lancashire
[Nutscode]:
UKD3 -
Greater Manchester
[Nutscode]:
UKD1 -
Cumbria
[Nutscode]:
UKD -
NORTH WEST (ENGLAND)
[Nutscode]:
UKC2 -
Northumberland and Tyne and Wear
[Nutscode]:
UKC1 -
Tees Valley and Durham
[Nutscode]:
UKC -
NORTH EAST (ENGLAND)
II.2.4)
[DescrProcurement]
Lot 3a will cover Decarbonisation Consultancy work in North England and North Wales.
Work under this lot could include provision of Managed Services including Retrofit lead generation and management to deliver eligible Customer referrals, Programme management to deliver eligible installations, Retrofit Advice, Assessment and Coordination Pre-Works, Retrofit Coordination and Evaluation, Deliver air permeability test to a dwelling, Deliver damp survey to a dwelling, Deliver thermographic image survey to a dwelling, Deliver EPR, Air Tightness Test and could also include the provision of interim support in some roles including Retrofit Coordinator, Retrofit Advisor, Retrofit Assessor, Retrofit Designer, Retrofit Evaluator, Project Administrator
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 16000000.00
GBP
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
84
[RenewalsSubject]:
[No]
[VariantsAccepted]:
[No]
[Options]:
[Yes]
[OptionsDescr]:
The framework includes an option to extend for a further 3 years beyond the initial 4 year term to align with the Government target of 2030 for retrofit and decarbonisation work.
[EuProgrRelated]:
[No]
Consultancy Work - Midlands and Mid Wales
[LotNumber]:
3b
71314300
-
71315200
-
71321200
-
71321400
-
II.2.3)
[PlacePerformance]
[Nutscode]:
UKL24 -
Powys
[Nutscode]:
UKL15 -
Central Valleys
[Nutscode]:
UKG3 -
West Midlands
[Nutscode]:
UKG2 -
Shropshire and Staffordshire
[Nutscode]:
UKG1 -
Herefordshire, Worcestershire and Warwickshire
[Nutscode]:
UKF3 -
Lincolnshire
[Nutscode]:
UKF2 -
Leicestershire, Rutland and Northamptonshire
[Nutscode]:
UKF1 -
Derbyshire and Nottinghamshire
II.2.4)
[DescrProcurement]
Lot 3b will cover Decarbonisation Consultancy work in Midlands and Central Wales.
Work under this lot could include provision of Managed Services including Retrofit lead generation and management to deliver eligible Customer referrals, Programme management to deliver eligible installations, Retrofit Advice, Assessment and Coordination Pre-Works, Retrofit Coordination and Evaluation, Deliver air permeability test to a dwelling, Deliver damp survey to a dwelling, Deliver thermographic image survey to a dwelling, Deliver EPR, Air Tightness Test and could also include the provision of interim support in some roles including Retrofit Coordinator, Retrofit Advisor, Retrofit Assessor, Retrofit Designer, Retrofit Evaluator, Project Administrator
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 10500000.00
GBP
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
84
[RenewalsSubject]:
[No]
[VariantsAccepted]:
[No]
[Options]:
[Yes]
[OptionsDescr]:
The framework includes an option to extend for a further 3 years beyond the initial 4 year term to align with the Government target of 2030 for retrofit and decarbonisation work.
[EuProgrRelated]:
[No]
Consultancy Work - South West England and South Wales
[LotNumber]:
3c
71314300
-
71315200
-
71321200
-
71321400
-
II.2.3)
[PlacePerformance]
[Nutscode]:
UKL22 -
Cardiff and Vale of Glamorgan
[Nutscode]:
UKL21 -
Monmouthshire and Newport
[Nutscode]:
UKL18 -
Swansea
[Nutscode]:
UKL17 -
Bridgend and Neath Port Talbot
[Nutscode]:
UKL16 -
Gwent Valleys
[Nutscode]:
UKL14 -
South West Wales
[Nutscode]:
UKJ4 -
Kent
[Nutscode]:
UKJ3 -
Hampshire and Isle of Wight
[Nutscode]:
UKJ2 -
Surrey, East and West Sussex
[Nutscode]:
UKJ1 -
Berkshire, Buckinghamshire and Oxfordshire
[Nutscode]:
UKJ -
SOUTH EAST (ENGLAND)
II.2.4)
[DescrProcurement]
Lot 3c will cover Decarbonisation Consultancy work in South West England and South Wales.
Work under this lot could include provision of Managed Services including Retrofit lead generation and management to deliver eligible Customer referrals, Programme management to deliver eligible installations, Retrofit Advice, Assessment and Coordination Pre-Works, Retrofit Coordination and Evaluation, Deliver air permeability test to a dwelling, Deliver damp survey to a dwelling, Deliver thermographic image survey to a dwelling, Deliver EPR, Air Tightness Test and could also include the provision of interim support in some roles including Retrofit Coordinator, Retrofit Advisor, Retrofit Assessor, Retrofit Designer, Retrofit Evaluator, Project Administrator
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 6300000.00
GBP
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
84
[RenewalsSubject]:
[No]
[VariantsAccepted]:
[No]
[Options]:
[Yes]
[OptionsDescr]:
The framework includes an option to extend for a further 3 years beyond the initial 4 year term to align with the Government target of 2030 for retrofit and decarbonisation work.
[EuProgrRelated]:
[No]
Consultancy Work - South and East England
[LotNumber]:
3d
71314300
-
71315200
-
71321200
-
71321400
-
II.2.3)
[PlacePerformance]
[Nutscode]:
UKJ4 -
Kent
[Nutscode]:
UKJ3 -
Hampshire and Isle of Wight
[Nutscode]:
UKJ2 -
Surrey, East and West Sussex
[Nutscode]:
UKJ1 -
Berkshire, Buckinghamshire and Oxfordshire
[Nutscode]:
UKJ -
SOUTH EAST (ENGLAND)
[Nutscode]:
UKH3 -
Essex
[Nutscode]:
UKH2 -
Bedfordshire and Hertfordshire
[Nutscode]:
UKH1 -
East Anglia
[Nutscode]:
UKH -
EAST OF ENGLAND
II.2.4)
[DescrProcurement]
Lot 3d will cover Decarbonisation Consultancy work in South and East England.
Work under this lot could include provision of Managed Services including Retrofit lead generation and management to deliver eligible Customer referrals, Programme management to deliver eligible installations, Retrofit Advice, Assessment and Coordination Pre-Works, Retrofit Coordination and Evaluation, Deliver air permeability test to a dwelling, Deliver damp survey to a dwelling, Deliver thermographic image survey to a dwelling, Deliver EPR, Air Tightness Test and could also include the provision of interim support in some roles including Retrofit Coordinator, Retrofit Advisor, Retrofit Assessor, Retrofit Designer, Retrofit Evaluator, Project Administrator
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 21000000.00
GBP
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
84
[RenewalsSubject]:
[No]
[VariantsAccepted]:
[No]
[Options]:
[Yes]
[OptionsDescr]:
The framework includes an option to extend for a further 3 years beyond the initial 4 year term to align with the Government target of 2030 for retrofit and decarbonisation work.
[EuProgrRelated]:
[No]
Consultancy Work - London
[LotNumber]:
3e
71314300
-
71315200
-
71321200
-
71321400
-
II.2.3)
[PlacePerformance]
[Nutscode]:
UKI7 -
Outer London – West and North West
[Nutscode]:
UKI6 -
Outer London – South
[Nutscode]:
UKI5 -
Outer London – East and North East
[Nutscode]:
UKI4 -
Inner London – East
[Nutscode]:
UKI3 -
Inner London – West
[Nutscode]:
UKI -
LONDON
II.2.4)
[DescrProcurement]
Lot 3e will cover Decarbonisation Consultancy work in North England and North Wales.
Work under this lot could include provision of Managed Services including Retrofit lead generation and management to deliver eligible Customer referrals, Programme management to deliver eligible installations, Retrofit Advice, Assessment and Coordination Pre-Works, Retrofit Coordination and Evaluation, Deliver air permeability test to a dwelling, Deliver damp survey to a dwelling, Deliver thermographic image survey to a dwelling, Deliver EPR, Air Tightness Test and could also include the provision of interim support in some roles including Retrofit Coordinator, Retrofit Advisor, Retrofit Assessor, Retrofit Designer, Retrofit Evaluator, Project Administrator
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 16800000.00
GBP
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
84
[RenewalsSubject]:
[No]
[VariantsAccepted]:
[No]
[Options]:
[Yes]
[OptionsDescr]:
The framework includes an option to extend for a further 3 years beyond the initial 4 year term to align with the Government target of 2030 for retrofit and decarbonisation work.
[EuProgrRelated]:
[No]