II.1)
[QuantityScopeContract]
LiveWest Energy Efficiency Retrofit Contracts
[Fileref]:
Ech1254
[Works]
LiveWest has appointed Cardo Ltd to deliver Energy Efficiency Retrofit works for Lot 1 (Cornwall) and Lot 3 (North Devon and South Somerset). Ian Williams Ltd has been appointed to deliver Lot 2 (South Devon) and Lot 4 (Bristol, Bath and the West of England).
Each contract has a potential duration of up to 15 years, comprising an initial 5-year term with two optional 5-year extensions.
The contracts were procured through a Competitive Dialogue procedure in accordance with the Public Contracts Regulations 2015. This approach enabled LiveWest to refine the scope, delivery model and commercial structure to ensure best value, quality, and collaborative working throughout the programme.
These appointments will support LiveWest’s programme to improve the energy efficiency of homes across the Southwest, bringing properties currently below EPC C up to the EPC C standard.
[DivisionLots]:
[Yes]
[ValueExclVat]:
274300000.00
GBP
Energy Efficiency Retrofit Works - Cornwall
[LotNumber]:
1
45000000
-
09300000
-
09331000
-
09332000
-
42511110
-
42515000
-
42943210
-
44112600
-
44621000
-
44621110
-
44621200
-
44621210
-
44621220
-
45232141
-
45261410
-
45262100
-
45311100
-
45315000
-
45321000
-
45323000
-
45331000
-
45331100
-
45331110
-
45331200
-
45331210
-
45421100
-
45421110
-
45421112
-
45421130
-
71321200
-
II.2.3)
[PlacePerformance]
[Nutscode]:
UKK3 -
Cornwall and Isles of Scilly
[MainsiteplaceWorksDelivery]:
Cornwall
II.2.4)
[DescrProcurement]
Lot 1 will cover Energy Efficiency Retrofit work across Cornwall.
Expected work under the contract will include Insulations works; (EWI/IWI/Cavity/Loft/Suspended Floors/Room in Roof/Flat Roof Insulation/Cavity wall extraction (where applicable)), A++ windows/triple glazed and doors replacements. Roof replacements incorporating new insulation, Energy efficient condensing gas Boilers with A+ efficiency rating, Solar/PV panel system with Battery Storage, Air Source Heat Pumps, Ground Source Heat Pumps, Combined Heat and Power Systems (CHP), District Heating, Infrared Heating, High Heat Retention Storage Heaters, Electric Boilers, Hybrid Heat Pumps (Hydrogen boilers combined with electrically driven heat pumps), MVHR (Mechanical Ventilation with Heat Recovery), Smart Technology.
[AwardCriteriaBelow]
[AwardCriterionQuality]
-
[AwardCriterionName]:
Quality
/
[Weighting]:
70
[AwardLowestCost]
-
[AwardCriterionName]:
Cost
/
[Weighting]:
30
[Options]:
[Yes]
[OptionsDescr]:
There is an option to extend the contract after an initial 5 year term for a further ten years (5+5 years)
[EuProgrRelated]:
[No]
II.2.14)
[InfoAdditional]
Prospective bidders should note TUPE may apply to the contract; prospective bidders are advised to seek their own independent advice about the implications of TUPE.
Energy Efficiency Retrofit Work - South Devon
[LotNumber]:
2
09300000
-
09330000
-
09331000
-
09332000
-
42511110
-
42515000
-
42943210
-
44112600
-
44621000
-
44621110
-
44621200
-
44621210
-
44621220
-
45232141
-
45262100
-
45311100
-
45315000
-
45321000
-
45323000
-
45331000
-
45331100
-
45331110
-
45331200
-
45331210
-
45421100
-
45421110
-
45421112
-
45421130
-
71321200
-
II.2.3)
[PlacePerformance]
[MainsiteplaceWorksDelivery]:
South Devon
II.2.4)
[DescrProcurement]
Lot 2 will cover Energy Efficiency Retrofit work across South Devon.
Expected work under the contract will include Insulations works; (EWI/IWI/Cavity/Loft/Suspended Floors/Room in Roof/Flat Roof Insulation/Cavity wall extraction (where applicable)), A++ windows/triple glazed and doors replacements. Roof replacements incorporating new insulation, Energy efficient condensing gas Boilers with A+ efficiency rating, Solar/PV panel system with Battery Storage, Air Source Heat Pumps, Ground Source Heat Pumps, Combined Heat and Power Systems (CHP), District Heating, Infrared Heating, High Heat Retention Storage Heaters, Electric Boilers, Hybrid Heat Pumps (Hydrogen boilers combined with electrically driven heat pumps), MVHR (Mechanical Ventilation with Heat Recovery), Smart Technology.
[AwardCriteriaBelow]
[AwardCriterionQuality]
-
[AwardCriterionName]:
Quality
/
[Weighting]:
70
[AwardLowestCost]
-
[AwardCriterionName]:
Cost
/
[Weighting]:
30
[Options]:
[Yes]
[OptionsDescr]:
There is an option to extend the contract after an initial 5 year term for a further ten years (5+5 years)
[EuProgrRelated]:
[No]
II.2.14)
[InfoAdditional]
Prospective bidders should note TUPE may apply to the contract; prospective bidders are advised to seek their own independent advice about the implications of TUPE.
Energy Efficiency Retrofit Work - North Devon and South Somerset
[LotNumber]:
3
09300000
-
09330000
-
09331000
-
09332000
-
42511110
-
42515000
-
42943210
-
44112600
-
44621000
-
44621110
-
44621200
-
44621210
-
44621220
-
45232141
-
45261410
-
45262100
-
45311100
-
45315000
-
45321000
-
45323000
-
45331000
-
45331100
-
45331110
-
45331200
-
45331210
-
45421100
-
45421110
-
45421112
-
45421130
-
71321200
-
II.2.3)
[PlacePerformance]
[Nutscode]:
UKK4 -
Devon
[Nutscode]:
UKK23 -
Somerset
[MainsiteplaceWorksDelivery]:
North Devon and South Somerset
II.2.4)
[DescrProcurement]
Lot 3 will cover Energy Efficiency Retrofit work across North Devon and South Somerset.
Expected work under the contract will include Insulations works; (EWI/IWI/Cavity/Loft/Suspended Floors/Room in Roof/Flat Roof Insulation/Cavity wall extraction (where applicable)), A++ windows/triple glazed and doors replacements. Roof replacements incorporating new insulation, Energy efficient condensing gas Boilers with A+ efficiency rating, Solar/PV panel system with Battery Storage, Air Source Heat Pumps, Ground Source Heat Pumps, Combined Heat and Power Systems (CHP), District Heating, Infrared Heating, High Heat Retention Storage Heaters, Electric Boilers, Hybrid Heat Pumps (Hydrogen boilers combined with electrically driven heat pumps), MVHR (Mechanical Ventilation with Heat Recovery), Smart Technology.
[AwardCriteriaBelow]
[AwardCriterionQuality]
-
[AwardCriterionName]:
Quality
/
[Weighting]:
70
[AwardLowestCost]
-
[AwardCriterionName]:
Cost
/
[Weighting]:
30
[Options]:
[Yes]
[OptionsDescr]:
There is an option to extend the contract after an initial 5 year term for a further ten years (5+5 years)
[EuProgrRelated]:
[No]
II.2.14)
[InfoAdditional]
Prospective bidders should note TUPE may apply to the contract; prospective bidders are advised to seek their own independent advice about the implications of TUPE.
Energy Efficiency Retrofit Work - Bristol, Bath and West of England
[LotNumber]:
4
09300000
-
09330000
-
09331000
-
09332000
-
42511110
-
42515000
-
42943210
-
44112600
-
44621000
-
44621110
-
44621200
-
44621210
-
44621220
-
45232141
-
45261410
-
45262100
-
45311100
-
45315000
-
45321000
-
45323000
-
45331000
-
45331100
-
45331110
-
45331200
-
45331210
-
45421100
-
45421110
-
45421112
-
45421130
-
71321200
-
II.2.3)
[PlacePerformance]
[Nutscode]:
UKK12 -
Bath and North East Somerset, North Somerset and South Gloucestershire
[Nutscode]:
UKK11 -
Bristol, City of
[Nutscode]:
UKK1 -
Gloucestershire, Wiltshire and Bristol/Bath area
[MainsiteplaceWorksDelivery]:
Bristol, Bath and West of England
II.2.4)
[DescrProcurement]
Lot 4 will cover Energy Efficiency Retrofit work across Bristol, Bath and the West of England.
Expected work under the contract will include Insulations works; (EWI/IWI/Cavity/Loft/Suspended Floors/Room in Roof/Flat Roof Insulation/Cavity wall extraction (where applicable)), A++ windows/triple glazed and doors replacements. Roof replacements incorporating new insulation, Energy efficient condensing gas Boilers with A+ efficiency rating, Solar/PV panel system with Battery Storage, Air Source Heat Pumps, Ground Source Heat Pumps, Combined Heat and Power Systems (CHP), District Heating, Infrared Heating, High Heat Retention Storage Heaters, Electric Boilers, Hybrid Heat Pumps (Hydrogen boilers combined with electrically driven heat pumps), MVHR (Mechanical Ventilation with Heat Recovery), Smart Technology.
[AwardCriteriaBelow]
[AwardCriterionQuality]
-
[AwardCriterionName]:
Quality
/
[Weighting]:
70
[AwardLowestCost]
-
[AwardCriterionName]:
Cost
/
[Weighting]:
30
[Options]:
[Yes]
[OptionsDescr]:
There is an option to extend the contract after an initial 5 year term for a further ten years (5+5 years)
[EuProgrRelated]:
[No]
II.2.14)
[InfoAdditional]
Prospective bidders should note TUPE may apply to the contract; prospective bidders are advised to seek their own independent advice about the implications of TUPE.