II.1)
Scope of the procurement
External Chemical Tank Inspections
Reference number:
PRO004724
50514100
-
Repair and maintenance services of tanks
Services
II.1.4)
Short description
The external inspections of chemical/fuel tanks is to be procured by the Company for in service Category A/B tanks located across its Water, Wastewater and Bioresources sites. The Services Framework scope of the inspections include external/non-intrusive tests on a variety of chemical/fuel tanks in accordance with EEMUA 159 standards. The tanks vary in size and age and are constructed from Steel, Plastic and GRP. The Contractor must have the appropriate EEMUA 159 or equivalent qualifications in order to complete the inspection, and EEMUA 159 TankAssessor to produce a report ultimately assessing the fitness for service of the tank. The Company has an indicative programme of work including what tanks are expected to require inspections within the next several years but the Contractor shall complete the inspections as directed by the Company.
II.1.6)
Information about lots
This contract is divided into lots:
no
II.1.7)
Total value of the procurement
( Agree to publish? yes )
Value excluding VAT:
1030927.55
GBP
II.2.2)
Additional CPV code(s)
44611400
-
Storage tanks
44611410
-
Oil-storage tanks
50514100
-
Repair and maintenance services of tanks
90913000
-
Tank and reservoir cleaning services
90913100
-
Tank-cleaning services
II.2.3)
Place of performance
NUTS code:
UKD -
NORTH WEST (ENGLAND)
Main site or place of performance:
North West England
II.2.4)
Description of the procurement
The Company has many Chemical/Fuel tanks located across the Water, Wastewater and Bioresource sites. Some of these tanks have been identified as high-risk Category A/B tanks that require in service external inspections. The tanks vary in age and size and are constructed out of Plastic, Steel and GRP. They contain many different chemicals and fuels used across the Company’s sites.
The external/non-intrusive inspections must be completed in accordance with EEMUA 159 standards. The Contractor must have the appropriate qualifications to complete the inspections and submit the reports assessing the tanks fitness for Service.
The Company has developed an indicative programme of work, identifying what tanks are expected to require inspections and when. The Company will work with the Contractor to schedule the inspections at the most appropriate times.
It is essential that the tanks located on site are inspected within an appropriate timeframe in order to ensure that the assets are in a safe condition and to protect the health and safety of all site personnel. Excluded from the Framework scope will be any internal/intrusive inspections.
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no