09310000
-
Electricity
09320000
-
Steam, hot water and associated products
09343000
-
Radioactive materials
09344000
-
Radio-isotopes
24111000
-
Hydrogen, argon, rare gases, nitrogen and oxygen
24111600
-
Hydrogen
31161400
-
Primary water systems
38340000
-
Instruments for measuring quantities
38420000
-
Instruments for measuring flow, level and pressure of liquids and gases
38570000
-
Regulating and controlling instruments and apparatus
38930000
-
Humidity and moisture measuring instruments
42120000
-
Pumps and compressors
42122100
-
Pumps for liquids
42131100
-
Valves defined by function
42131140
-
Pressure-reducing, control, check or safety valves
42900000
-
Miscellaneous general and special-purpose machinery
42993000
-
Chemical industry machinery
45255400
-
Fabrication work
45262670
-
Metalworking
45262680
-
Welding
45300000
-
Building installation work
51100000
-
Installation services of electrical and mechanical equipment
51110000
-
Installation services of electrical equipment
51120000
-
Installation services of mechanical equipment
51810000
-
Installation services of tanks
51820000
-
Installation services of reservoirs
71242000
-
Project and design preparation, estimation of costs
71320000
-
Engineering design services
71323200
-
Plant engineering design services
71335000
-
Engineering studies
NUTS code:
UKJ14 -
Oxfordshire
Main site or place of performance:
Culham Science Centre, OX14 3DB
The Supply of an ADS equipment package to be supplied into the Hydrogen-3 Advanced Technology Facility at UKAEA’s Culham Campus. The scope of work is expected to be delivered, installed, and commissioned within an estimated duration of 36 months.
Sub-system Package – the package scope of work includes design, manufacture, assembly, Factory Acceptance Testing, delivery, supply, installation, Site Acceptance Testing and commissioning.
Design – the package is to be produced by the Contractor and must support and contain the process equipment. Contractor is to identify tie-in connection points to process services as well as main process connections, process line and EC&I connections.
Manufacturing, FAT, Delivery, Installation and SAT – the package requires manufacture, assembly, installation, and SAT. This involves delivery and installation of all the equipment fabricated/procured by the Contractor to include provision of interface control and electrical distribution boxes and specific tie points for proce
Price is not the only award criterion and all criteria are stated only in the procurement documents
Duration in months:
3
This contract is subject to renewal:
no
The procurement is related to a project and/or programme financed by European Union funds:
no