Prior information notice

Information

Published

Expire date: 30/9/2024

External Reference: 2024-515212

FTS Reference: 2024-026117

Prior information notice

[NoticePin]

[Services]

[NoticeIsPriorInfoOnly]

[Section1]: [Ca]

I.1)

[NameAddressContact]

United Kingdom Atomic Energy Authority
N/A
Culham Campus
Abingdon
OX14 3DB
UK
[Contactpoint]: Calum Stead
[AddressPhone]: +44 1235466971
[AddressEmail]: Calum.stead@ukaea.uk
[Nutscode]:  UKJ14 -  Oxfordshire
[Internets]:
I.3)

[InfoTendering]

[AddressObtainDocs]:  
https://uk.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=84664&B=UKAEA
[AddressFurtherinfo]
[AsContactsAbove]:  
I.4)

[CaType]

[MaintypePublicbody]
I.5)

[Mainactivity]

[OtherActivity]:  Fusion Research

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

For the provision of an Embedded Engineering Resource Framework (EERF)
[Fileref]:  T/CS056/24
II.1.2)

[CpvMain]

71320000  - 
II.1.3)

[TypeContract]

[Services]
II.1.4)

[DescrShort]

The EERF is required to provide a mechanism by which UKAEA can call off requirements for resource that will be embedded into UKAEA to help fill specific technical or capability gaps that exist, helping UKAEA to meet its goal of Solving challenges of sustainable fusion energy - from design through to decommissioning - with world-leading science and engineering.
II.1.6)

[LotsInfo]

[DivisionLots]: [No]
II.2)

[Description]

II.2.2)

[CpvAdditional]

31682210  - 
71000000  - 
71312000  - 
71314100  - 
71321000  - 
71323000  - 
71323100  - 
71334000  - 
71631400  - 
72242000  - 
72253200  - 
73100000  - 
73200000  - 
73300000  - 
98391000  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  UKJ14 -  Oxfordshire
[MainsiteplaceWorksDelivery]:  
Culham Campus, OX14 3DB
II.2.4)

[DescrProcurement]

The EERF is required to provide a mechanism by which UKAEA can call off requirements for resource that will be embedded into UKAEA to help fill specific technical or capability gaps that exist, helping UKAEA to meet its goal of Solving challenges of sustainable fusion energy - from design through to decommissioning - with world-leading science and engineering.
II.3)

[DateOfContractNotice]:

16/9/2024

[Section4]: [Procedure]

IV.1)

[Description]

IV.1.8)

[GpaInfo]

[GpaCovered] : [Yes]
IV.2)

[InfoAdmin]

[Section6]: [InfoComplement]