II.1)
[QuantityScopeContract]
PRO004791-Goods-Framework-The Supply of Kiosks
[Fileref]:
PRO004791
[Supplies]
The purpose of this framework is to secure supply for a range of standard products developed to meet the predicted source demand of AMP8 for:
• Distribution Network Operator (DNO) kiosk
• CSO kiosk
• Detention Tank Return Pump kiosk
A kiosk is standalone structure which is designed for secure storage of electrical components. They can be manufactured from various materials such as steel or GRP.
The development of the standard kiosk products for the Better Rivers work stream has been developed for the DNO power supply, CSO screening, Detention Tank Return Pumps (electrical panel). The aforementioned plant and equipment are key components of a new treatment facility (requiring a new power supply) in the Better Rivers programme of work.
II.1.5)
[ValueMagnitudeEstimatedTotal]
[ValueExclVat]: 5500000.00
GBP
[DivisionLots]:
[Yes]
[LotsSubmittedFor]
[LotsAll]
PRO004791-Goods-Framework-The Supply of Kiosks
[LotNumber]:
1
II.2.3)
[PlacePerformance]
[Nutscode]:
UKD -
NORTH WEST (ENGLAND)
II.2.4)
[DescrProcurement]
The purpose of this framework is to secure supply for a range of standard products developed to meet the predicted source demand of AMP8 for:
• Distribution Network Operator (DNO) kiosk
• CSO kiosk
• Detention Tank Return Pump kiosk
A kiosk is standalone structure which is designed for secure storage of electrical components. They can be manufactured from various materials such as steel or GRP.
The development of the standard kiosk products for the Better Rivers work stream has been developed for the DNO power supply, CSO screening, Detention Tank Return Pumps (electrical panel). The aforementioned plant and equipment are key components of a new treatment facility (requiring a new power supply) in the Better Rivers programme of work.
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 5500000.00
GBP
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
96
[RenewalsSubject]:
[No]
[VariantsAccepted]:
[No]
[Options]:
[No]
[EuProgrRelated]:
[No]
II.2.14)
[InfoAdditional]
PQQ Response Deadline is 26th July 2024