II.1)
[QuantityScopeContract]
Bude Park, Hull, Children's Splash Pad Replacement
[Works]
Creation of a new waterplay facility in Bude Park Playground to replace existing paddling pools with a low maintenance splash pad facility in a new location. This is to be an all-new facility, built from scratch on an area of existing grass and closer to the car park. Demolition of existing paddling pools and plant room; plus, the refurbishment of the existing WC facilities within the Rangers station.
II.1.5)
[ValueMagnitudeEstimatedTotal]
[ValueExclVat]: 256000.00
GBP
[DivisionLots]:
[No]
44000000
-
45100000
-
45200000
-
45300000
-
45400000
-
II.2.3)
[PlacePerformance]
[Nutscode]:
UK -
UNITED KINGDOM
II.2.4)
[DescrProcurement]
Creation of a new waterplay facility in Bude Park Playground to replace existing paddling pools with a low maintenance splash pad facility in a new location. This is to be an all-new facility, built from scratch on an area of existing grass and closer to the car park. Demolition of existing paddling pools and plant room; plus, the refurbishment of the existing WC facilities within the Rangers station.
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 256000.00
GBP
II.2.7)
[DurationContractFrameworkDps]
[Starting]:
2024-03-29
/
[End]:
2024-06-28
[RenewalsSubject]:
[No]
[VariantsAccepted]:
[No]
[Options]:
[No]
[EuProgrRelated]:
[No]