NNL have been requested to install the necessary
equipment to develop a salt clean up development facility within NNL’s Workington facility.
The Sub-contractor is required to design, build, and commission a salt clean up development facility within the footprint of an area in the Workington rig hall facility.
The contract is to be placed to fulfil a requirement for a facility that can be used to develop methods for purifying salts from heavy metals.
The new laboratory is to be installed within the old CAF Lab. at NNL’s Workington Facility and be operational for 5 years.
The contractor scope of work is limited to the Laboratory facility redevelopment including the procurement and installation of the following equipment to enable operations and future capability..
Regulation, Standards Testing & Commissioning
CDM, EMC, COSHH, Current Electrical Mechanical, Compressed gases, Heating Ventilation and Drainage manufacture, installation, and commissioning standards.
II.1.5)
Estimated total value
Value excluding VAT: 700000.00
GBP
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
39180000
-
Laboratory furniture
39181000
-
Laboratory benching
51430000
-
Installation services of laboratory equipment
71900000
-
Laboratory services
79421200
-
Project-design services other than for construction work
79933000
-
Design support services
II.2.3)
Place of performance
NUTS code:
UK -
UNITED KINGDOM
II.2.4)
Description of the procurement
NNL have been requested to install the necessary
equipment to develop a salt clean up development facility within NNL’s Workington facility.
The Sub-contractor is required to design, build, and commission a salt clean up development facility within the footprint of an area in the Workington rig hall facility.
The contract is to be placed to fulfil a requirement for a facility that can be used to develop methods for purifying salts from heavy metals.
The new laboratory is to be installed within the old CAF Lab. at NNL’s Workington Facility and be operational for 5 years.
The contractor scope of work is limited to the Laboratory facility redevelopment including the procurement and installation of the following equipment to enable operations and future capability: -
• 4 off. Fume hoods
• Double Dissolver
• Precipitation Vessel
• Filtration Boat
• Furnace
• Evaporator
• Waste Liquor collection vessel
• Sink
• Foul waste drainage system
• Deionisation machine
• Room extraction ventilation system
• Fume hood ventilation
• Bottle fed argon and nitrogen supply
• Hydrogen monitor
Regulation, Standards Testing & Commissioning
CDM, EMC, COSHH, Current Electrical Mechanical, Compressed gases, Heating Ventilation and Drainage manufacture, installation, and commissioning standards.
Price is not the only award criterion and all criteria are stated only in the procurement documents
Value excluding VAT: 700000.00
GBP
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Start:
02/12/2024
/
End:
This contract is subject to renewal:
no
II.2.10)
Information about variants
Variants will be accepted:
no
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no