Date of dispatch of this notice: 13/03/2023
Expire date: 02/05/2023
External Reference: 96a777f9-d503-4522-9fc4-51f08ccb9716
Date of dispatch of this notice: 13/03/2023
Expire date: 02/05/2023
External Reference: 96a777f9-d503-4522-9fc4-51f08ccb9716
Official name: The Borough Council of Calderdale
Url: https://www.calderdale.gov.uk/v2
Address line 1: Town Hall, Crossley Street
Town: Halifax
Postal Code: HX1 1UJ
Country: England
Contact person: Helen Kershaw
E-mail: helen.kershaw@calderdale.gov.uk
Phone:
Title attributed to the contract: Elland Future High Street Fund – Cartwheel Club
Description:
The original use of the building was as a Methodist Church. The current building has been a community hub for some years controlled and managed by a Trust. A refurbishment programme is planned which involves a programme of refurbishment which is broadly detailed below. Planning Approval for the refurbishment work has been obtained. A copy of the Planning decision notice is attached within appendix I. The Contractor will need to allow for discharging 8 nr planning conditions as part of the works along with obtaining Building Control Approval. For a full description, please also refer to the drawings and the scope of the work. Refurbishment to the main building by: Removal of and installation of new windows Removal of existing doors and installation of new doors – including fire doors and front door and window Removal of and installation of new rainwater goods Stripping and recovering the existing roofing areas Repairs to and replacement of ceilings Demolition of internal basement walls and establishing new walls Electrical re-wire Installation of new plumbing within the building
Additional data
User / Company