09300000
-
Electricity, heating, solar and nuclear energy
09323000
-
District heating
09331100
-
Solar collectors for heat production
09331200
-
Solar photovoltaic modules
31527260
-
Lighting systems
31610000
-
Electrical equipment for engines and vehicles
45100000
-
Site preparation work
45210000
-
Building construction work
45211310
-
Bathrooms construction work
45232141
-
Heating works
45260000
-
Roof works and other special trade construction works
45261211
-
Roof-tiling work
45261410
-
Roof insulation work
45300000
-
Building installation work
45315300
-
Electricity supply installations
45320000
-
Insulation work
45331000
-
Heating, ventilation and air-conditioning installation work
45400000
-
Building completion work
45421100
-
Installation of doors and windows and related components
45421151
-
Installation of fitted kitchens
71200000
-
Architectural and related services
71300000
-
Engineering services
71500000
-
Construction-related services
NUTS code:
UK -
UNITED KINGDOM
Hyde’s intention in respect of this invitation to tender is for the installation of renewable technologies, equipment, and fabric measures in Hyde properties in Kent. The Contractor will generally be required to carry out the design and installation of renewable technologies and equipment, including Solar PV and Air Source Heat Pumps, as well as fabric measures, such as loft and cavity wall insulation, and ventilation measures. The works carried out must be compliant with PAS 2035:2019 and all installations must comply with PAS 2030:2019 requirements. Energy efficiency measures within the scope of PAS 2030:2019 must be delivered by installers who are certified to that standard for the measure to be installed. It is the role of the Retrofit Coordinator to ensure installers are competent and qualified to the required standards. The installer(s) of the measures must be TrustMark registered. Micro-Generation Scheme (MCS) certificates will be required where low carbon heating systems are installed.
Criteria below
Quality criterion
-
Name:
Quality
/
Weighting:
60%
Price
-
Weighting:
40%
The procurement is related to a project and/or programme financed by European Union funds:
yes
Identification of the project:
European Regional Development Fund (ERDF) funded programme
*All practical works undertaken in this contract must be completed by 30th June 2023.*