Date of dispatch of this notice: 17/08/2022
Expire date: 15/09/2022
External Reference: e4df4400-fa26-4637-8bbc-0fbc6c01bb1b
Date of dispatch of this notice: 17/08/2022
Expire date: 15/09/2022
External Reference: e4df4400-fa26-4637-8bbc-0fbc6c01bb1b
Official name: Hyde Housing Association Ltd
Url: https://www.hyde-housing.co.uk
Address line 1: 30 Park Street
Town: London
Postal Code: SE1 9EQ
Country: England
Contact person: Tarvinder Bhungle
E-mail: Tarvinder.Bhungle@hyde-housing.co.uk
Phone: +44 2073785074
Title attributed to the contract: South East New Energy (SENE) European Regional Development Fund (ERDF) Energy Retrofit Project
Description:
Hyde’s intention in respect of this invitation to tender is for the installation of renewable technologies, equipment, and fabric measures in Hyde properties in Kent. The Contractor will generally be required to carry out the design and installation of renewable technologies and equipment, including Solar PV and Air Source Heat Pumps, as well as fabric measures, such as loft and cavity wall insulation, and ventilation measures. The works carried out must be compliant with PAS 2035:2019 and all installations must comply with PAS 2030:2019 requirements. Energy efficiency measures within the scope of PAS 2030:2019 must be delivered by installers who are certified to that standard for the measure to be installed. It is the role of the Retrofit Coordinator to ensure installers are competent and qualified to the required standards. The installer(s) of the measures must be TrustMark registered. Micro-Generation Scheme (MCS) certificates will be required where low carbon heating systems are installed.
Additional data
User / Company
Hyde’s intention in respect of this invitation to tender is for the installation of renewable technologies, equipment, and fabric measures in Hyde properties in Kent. The Contractor will generally be required to carry out the design and installation of renewable technologies and equipment, including Solar PV and Air Source Heat Pumps, as well as fabric measures, such as loft and cavity wall insulation, and ventilation measures. The works carried out must be compliant with PAS 2035:2019 and all installations must comply with PAS 2030:2019 requirements. Energy efficiency measures within the scope of PAS 2030:2019 must be delivered by installers who are certified to that standard for the measure to be installed. It is the role of the Retrofit Coordinator to ensure installers are competent and qualified to the required standards. The installer(s) of the measures must be TrustMark registered. Micro-Generation Scheme (MCS) certificates will be required where low carbon heating systems are installed. *All practical works undertaken in this contract must be completed by 30th June 2023.*