II.1)
Scope of the procurement
Bray, Burnham, Dorney, Taplow Towers Major Works Project
Reference number:
EU Supply Tender Reference: 44355
45262650
-
Cladding works
Works
II.1.4)
Short description
The London Borough of Camden (‘the Council’) is seeking to award a contract for recladding works to the Bray, Burnham, Dorney and Taplow towers, together with associated works to the envelope of the buildings, including full window replacement, renewal of flat roofs, installation of building maintenance units (BMU), replacement of brickwork to the ground and first floor levels, including vents, louvers and canopies as well as insulation to the undercroft as required. Related works will include radiator installations, internal making good and decorating as well as installation of relevant power supplies to BMUs and louvers.
The project will comprise of the replacement of the previous cladding system, which has been removed, the curtain walling, associated remedial work and making good, and window replacement throughout. The total façade area is approximately 30,000m2.
Construction Duration: 22 to 25 months
II.1.5)
Estimated total value
Value excluding VAT: 100000000.00
GBP
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
44221100
-
Windows
45261910
-
Roof repair
45262520
-
Bricklaying work
45421132
-
Installation of windows
II.2.3)
Place of performance
Main site or place of performance:
Chalcots Estate
II.2.4)
Description of the procurement
The scope of the major works are detailed in the technical specification and can be summarised as follows: The London Borough of Camden (‘the Council’) is seeking to award a contract for recladding works to the Bray, Burnham, Dorney and Taplow towers, together with associated works to the envelope of the buildings, including full window replacement, renewal of flat roofs, installation of building maintenance units (BMU), replacement of brickwork to the ground and first floor levels, including vents, louvers and canopies as well as insulation to the undercroft as required. Related works will include radiator installations, internal making good and decorating as well as installation of relevant power supplies to BMUs and louvers.
The project will comprise of the replacement of the previous cladding system, which has been removed, the curtain walling, associated remedial work and making good, and window replacement throughout. The total façade area is approximately 30,000m2.
Construction Duration: 22 to 25 months
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Duration in months:
25
This contract is subject to renewal:
no
II.2.9)
Information about the limits on the number of candidates to be invited
Envisaged number of candidates:
6
II.2.10)
Information about variants
Variants will be accepted:
no
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no