II.1)
Scope of the procurement
STEP Cost Modelling Partner
Reference number:
T/CE059/20
71242000
-
Project and design preparation, estimation of costs
Services
II.1.4)
Short description
STEP Cost Modelling Partner - Balance of plant costs and Construction design study
II.1.6)
Information about lots
This contract is divided into lots:
no
II.1.7)
Total value of the procurement
Value excluding VAT:
500000.00
GBP
II.2.2)
Additional CPV code(s)
71241000
-
Feasibility study, advisory service, analysis
71244000
-
Calculation of costs, monitoring of costs
71300000
-
Engineering services
71310000
-
Consultative engineering and construction services
71311300
-
Infrastructure works consultancy services
71314000
-
Energy and related services
71314100
-
Electrical services
71320000
-
Engineering design services
71322100
-
Quantity surveying services for civil engineering works
71335000
-
Engineering studies
71336000
-
Engineering support services
II.2.3)
Place of performance
Main site or place of performance:
Culham
II.2.4)
Description of the procurement
STEP Cost Modelling Partner - Balance of plant costs and Construction design study
Criteria below
Quality criterion
-
Name:
Delivery Plan
/
Weighting:
30%
Quality criterion
-
Name:
Maximising Effectiveness
/
Weighting:
30%
Quality criterion
-
Name:
Operational Experience
/
Weighting:
10%
Quality criterion
-
Name:
Individual and Team Expertise
/
Weighting:
20%
Quality criterion
-
Name:
Social Value
/
Weighting:
10%
Cost criterion
-
Name:
Fixed Price - Phase 1A
/
Weighting:
45%
Cost criterion
-
Name:
Fixed Price - Phase 1B
/
Weighting:
10%
Cost criterion
-
Name:
Schedule of Rates
/
Weighting:
45%
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no
II.2.14)
Additional information
Final weighted score for Quality - 75%
Final weight for pricing - 25%