II.1)
Scope of the procurement
Beech Hurst Boiler Replacement
Reference number:
PAM020
42160000
-
Boiler installations
Supplies
II.1.4)
Short description
Beech Hurst is the headquarters building for Test Valley Borough Council (TVBC) with four number plant rooms located at third floor level, with restricted access from the mezzanine floor. Each plant room contains three gas modular boilers providing heating to each corner of the building (NE, NW, SE, and SW)
The project comprises of the replacement of the existing Gas fired modular boilers installed in the region of 30 years ago with new modern energy efficient LPHW gas boilers and flues, together with new Building Management Control (BMS) package, weather compensation technology and optimised controls. Including all builders work in conjunction with these works.
The selected contractor will be responsible for all aspects of the delivery of works and the co-ordination of all sub-contractors.
It is intended that the works be carried out in two phases over the summer of 2020 carrying out works to two boiler rooms at any one time.
II.1.5)
Estimated total value
Value excluding VAT: 500000.00
GBP
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
44621200
-
Boilers
45331110
-
Boiler installation work
II.2.4)
Description of the procurement
Beech Hurst is the headquarters building for Test Valley Borough Council (TVBC) with four number plant rooms located at third floor level, with restricted access from the mezzanine floor. Each plant room contains three gas modular boilers providing heating to each corner of the building (NE, NW, SE, and SW)
The project comprises of the replacement of the existing Gas fired modular boilers installed in the region of 30 years ago with new modern energy efficient LPHW gas boilers and flues, together with new Building Management Control (BMS) package, weather compensation technology and optimised controls. Including all builders work in conjunction with these works.
The selected contractor will be responsible for all aspects of the delivery of works and the co-ordination of all sub-contractors.
It is intended that the works be carried out in two phases over the summer of 2020 carrying out works to two boiler rooms at any one time. The contractors attention is drawn to the fact that the office will be fully open during the contract period; method statements and previous experience submitted should reflect these and all other relevant facts.
Price is not the only award criterion and all criteria are stated only in the procurement documents
Value excluding VAT: 500000.00
GBP
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Start:
15/06/2020
/
End:
14/09/2020
This contract is subject to renewal:
no
II.2.10)
Information about variants
Variants will be accepted:
yes
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no
II.2.14)
Additional information
Full information can be accessed on our eTendering system at https://uk.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=32704&B=UK