Date of dispatch of this notice: 11/04/2019
External Reference: 274e78d7-f198-42b8-a38e-f33e03fd0a91
Date of dispatch of this notice: 11/04/2019
External Reference: 274e78d7-f198-42b8-a38e-f33e03fd0a91
Official name: Cheshire Fire Authority
Url: https://www.cheshirefire.gov.uk/
Address line 1: Headquarters, Clemonds Hey, Oakmere Road,
Town: Winsford, Cheshire
Postal Code: CW7 2UA
Country: England
Contact person: Helen Elliott
E-mail: helen.elliott@cheshire.pnn.police.uk
Phone: +44 1606362063
Title attributed to the contract: Initial Site Surveys for New Crewe Fire and Police Station
Description:
Cheshire Fire Authority are undertaking a construction project, in conjunction with Cheshire Police to rebuild their existing Fire Station at Crewe with a new Joint Fire and Police Station. As a part of the initial feasibility studies into this project the Fire Authority wishes to appoint a survey company to undertake, Topographical, Ecological, GPR, Aboricultural, Drainage and Utility Surveys. These surveys are to be undertaken for Cheshire Fire Authority and will be passed to the Concept Architect and Design and Build Contractor for use in developing the scheme. The successful bidder will be required to provide a Warranty to the appointed Design and Build Contractor.
This is a contract award notice for Cheshire Fire Authority
Awarded Date: 20/02/2019
Awarded Value:
11,735.00
Contract start date: 25/02/2019
Contract end date: 31/03/2020
This is a contract award notice - Contact ref: CPA/SPU/1143F