II.1)
Scope of the procurement
ANPR Requirements
Reference number:
ICT 195
42961300
-
Vehicle location system
Supplies
II.1.4)
Short description
The ODPCVC wishes to appoint a Contractor to provide the supply, installation and commissioning of ANPR cameras and associated interfaces to their current ANPR Back Office System (BOF)
The approximate quantities required for the initial part of this contract is listed below:
2017-18 8 x dual lane ANPR cameras with associated services
De-commissioning of 3 x ANPR cameras.
2018-19 10 x Dual lane ANPR cameras with associated services
Please note this opportunity is to establish a framework agreement which may be used by other forces however there is no commitment from any force to utilise this agreement.
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
30216120
-
Optical-character-recognition equipment
34971000
-
Speed camera equipment
35125300
-
Security cameras
38651000
-
Cameras
42415320
-
Equipment for emergency vehicles
II.2.3)
Place of performance
NUTS code:
UKC1 -
Tees Valley and Durham
II.2.4)
Description of the procurement
The ODPCVC wishes to appoint a Contractor to provide the supply, installation and commissioning of ANPR cameras and associated interfaces to their current ANPR Back Office System (BOF)
The approximate quantities required for the initial part of this contract is listed below:
2017-18 8 x dual lane ANPR cameras with associated services
De-commissioning of 3 x ANPR cameras.
2018-19 10 x Dual lane ANPR cameras with associated services
Please note this opportunity is to establish a framework agreement which may be used by other forces however there is no commitment from any force to utilise this agreement.
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Duration in months:
24
This contract is subject to renewal:
yes
Description of renewals:
Contract can be extended for up to a further 12 months.
II.2.10)
Information about variants
Variants will be accepted:
no
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no