94382 - PMP 25 - ROOFING WORKS AT NINELANDS PRIMARY SCHOOL NINELANDS LANE, MOOR GARFORTH, LEEDS, LS25 1NT

• To Block 2 Roof 1: Strip back existing flat roof covering to timber decking. Reinforce existing decking with primed ply board decking. Install 2 layer flat roof system with underlay and cap sheet. Existing kitchen plant to be removed and reinstated. Remove existing ACM roof deck to Roof 1 boiler house. •To Block 2 Roof 2: Strip back existing flat roof covering to existing decking. Reinforce existing deck with primed ply deck. Install 3 layered high performance flat roof system with new VCL, insulation, underlay and cap sheet.

31/01/2025 12:00:00

44112400-2  Roof
45261200-6  Roof-covering and roof-painting work
45261900-3  Roof repair and maintenance work
45261000-4  Erection and related works of roof frames and coverings
45261100-5  Roof-framing work


Leeds City Council
Civic Hall, 3rd Floor West,
LS1 1UR
Leeds
United Kingdom
View profile


https://www.leeds.gov.uk/

Published notices
Contract Notice (CTM public site) 20/12/2024 16:08
Lots
PMP 25 - ROOFING WORKS AT NINELANDS PRIMARY SCHOOL NINELANDS LANE, MOOR GARFORTH, LEEDS, LS25 1NT
Additional information:
Documents Documents
Close