The scope shall be for the Contractor to be responsible for Design and Construction of a warehouse referred to as Alex Dock Multi User Warehouse (MUW) based at Port of Liverpool. The footprint of the warehouse is approximately 247,500 square foot and it is to be designed to maximise the clear internal height. The scope includes but is not limited to:- Ground preparation and foundation works Warehouse frame, push walls, cladding and roof lights Associated power, water and waste connections External lights External surfacing External barriers, bollards and fencing Office and welfare facilities Weighbridges and marshalling cabin Car park area including EV charging, signage and white lining Warehouse to be designed and built in line with current building regulations the Peel Ports Group HSE Fire Safety requirements.
Works
17/10/2022 10:00:00
45213200-5 Construction work for warehouses and industrial buildings
Peel Ports Investments Limited
Maritime Centre
L21 1LA
Liverpool
United Kingdom
Notice | Date of dispatch |
---|---|
Contract notice - utilities (FTS) |