The school have suffered a recent flood incident which entered the lower ground floor Nursery Area up to approx. 300mm up the wall surfaces. The works are to disinfect the existing hard surfaces in preparation for new finishes to be installed. Timber elements still on site remaining where foul water was able to soak in will be removed and renewed. Please see tender documents for further details.
06/05/2022 13:00:00
45453100-8 Refurbishment work
45000000-7 Construction work
45210000-2 Building construction work
45453000-7 Overhaul and refurbishment work
Notice | Date of dispatch |
---|---|
Awarded Contract (Contracts Finder) | 16/06/2022 09:33 |