PR-PS - Foulon Cremation Replacement Cremators and Alterations

The quote/tender has ended, you cannot answer the invitation.

The main requirement of the project is to replace the existing Cremator, which was coming to the end of its life, with two new cremators housed in a new extension to the Crematorium whilst at the same time decommissioning the old one and repurposes the back of house area. The main Chapel would be upgraded at the same time with new underfloor heating, insulation, screed and floor finishes, to the side of the Chapel new toilet facilitates would be created. At the lower end of the site a large car park area would be created and a new Disabled Toilet created at the end of the Groundsman Lodge.

Works

29/10/2021 12:00:00

42000000-6  Industrial machinery
44000000-0  Construction structures and materials; auxiliary products to con
45000000-7  Construction work
71000000-8  Architectural, construction, engineering and inspection services


States of Guernsey
Sir Charles Frossard House, La Charroterie
GY1 1FH
St. Peter Port
United Kingdom
View profile


http://www.gov.gg

Published notices
Contract Notice (CTM public site) 02/09/2021 10:34
Lots
Consultant PIR Report for Foulon Crematorium Alterations

Consultant selection and appointment to undertake a formal PIR (Post Implementation Review) Report after the completion of the building works for the extension and refurbishment of Foulon Crematorium

Additional information:
Documents Documents
Quote/tender mailing address:
Sir Charles Frossard House, La Charroterie
GY1 1FH
St Peter Port (Guernsey)
United Kingdom
Close