PCH Board has approved the replacement of Marlborough House with 148 new build flats for social rent with an estimated build contract of £41.7m within a building of similar height (please see attached option report prepared by Kendall Kingscott).. The block should be fully decanted during late 2027 and the intention at this point is to let a demolition and new build JCT Design and Build contract through a 2-stage procurement process, subject to advice from the project Employers Agent. PCH is in the process of rehoming residents from Marlborough House form the existing 13-storey building consisting of 121 flats. PCH wishes to appoint a consultant team to lead the redevelopment of Marlborough House.
25/07/2025 12:00:00
71530000-2 Construction consultancy services
71000000-8 Architectural, construction, engineering and inspection services
71200000-0 Architectural and related services
71210000-3 Advisory architectural services
71240000-2 Architectural, engineering and planning services
Plymouth Community Homes
Plumer House Tailyour Road
PL6 5DH
Plymouth
United Kingdom
View profile
Notice | Date of dispatch |
---|---|
Tender Notice (FTS (PA23)) | 30/06/2025 15:17 |
PCH Board has approved the replacement of Marlborough House with 148 new build flats for social rent with an estimated build contract of £41.7m within a building of similar height. PCH is in the process of rehoming residents from Marlborough House from the existing 13-storey building consisting of 121 flats. PCH wishes to appoint a consultant team to lead the redevelopment of Marlborough House.