United Utilities is committed to building a greener energy portfolio that reduces operational carbon emissions and supports our ambition to achieve net‑zero greenhouse gas emissions by 2050. As one of the largest water and wastewater service providers in the UK, we operate more than 100 water treatment works and 575 wastewater treatment works across the North West of England. These sites have significant energy demands and require robust power resilience to maintain essential services for our customers. Our operational footprint across the region presents substantial opportunities to integrate low‑carbon and renewable energy solutions. Many of our sites have available land or roof space suitable for on‑site generation. In addition, we are seeking opportunities for work with existing or upcoming renewable generation assets close to our operational sites to develop private‑wire Power Purchase Agreements (PPAs). Together, these opportunities support our drive to reduce operational emissions and contribute to a greener, stronger, and healthier North West. To advance this ambition, we are seeking long‑term Power Purchase Agreements through a procurement process structured into three parts: Part 1: Existing Generation: Low‑carbon or renewable generation assets that are currently available—or expected to become available—for private‑wire connection within the North West of England. Part 2: Site‑Based Development: Low‑carbon or renewable generation projects that can be developed on United Utilities‑owned land within the region. Part 3: Site‑Based Development (Roof‑Mounted): Solar PV installations that can be developed on suitable roof areas across United Utilities’ property portfolio in the North West. Suppliers may bid for all three parts or select any individual part that aligns with their expertise, capabilities, and experience.
06/03/2026 23:00:00
71314000-2 Energy and related services
09300000-2 Electricity, heating, solar and nuclear energy
09330000-1 Solar energy
31121300-3 Wind-energy generators
65400000-7 Other sources of energy supplies and distribution
United Utilities Water Limited
Lingley Mere Business Park
WA5 3LP
Warrington
United Kingdom
View profile
| Notice | Date of dispatch |
|---|---|
| Dynamic market intention notice (FTS (PA23)) | 06/02/2026 18:00 |
Part 1 seeks opportunities from developers and suppliers focused on existing or proposed low‑carbon or renewable generation that can power United Utilities’ operational sites through a direct‑wire connection.
Suppliers will find three documents in the EU Supply portal for the Phase 1 Conditions for Membership. The first two (Scopebook and Instructions for Admission) are for information. The third (Response Book/Questionnaire) contains required questions for completion, alongside the need for additional supporting documents as attachments. A fully completed Response Book is required for each Part applicants wish to apply for.
Part 2 provides suppliers with the opportunity to bid for low‑carbon and renewable development opportunities on operational land already owned by United Utilities.
Suppliers will find three documents in the EU Supply portal for the Phase 1 Conditions for Membership. The first two (Scopebook and Instructions for Admission) are for information. The third (Response Book/Questionnaire) contains required questions for completion, alongside the need for additional supporting documents as attachments. A fully completed Response Book is required for each Part applicants wish to apply for.
Part 3 provides opportunities for roof‑based development on existing operational buildings located on land owned by United Utilities. The resulting generation will supply power for the operation of the designated site.
Suppliers will find three documents in the EU Supply portal for the Phase 1 Conditions for Membership. The first two (Scopebook and Instructions for Admission) are for information. The third (Response Book/Questionnaire) contains required questions for completion, alongside the need for additional supporting documents as attachments. A fully completed Response Book is required for each Part applicants wish to apply for.