The University of West London (UWL) wishes to appoint a professional firm to provide works as per the requirement in the pre-construction document. Both service cost and quality are of paramount importance to the University. The University of West London wishes to engage a Principal Contractor to provide a key-turn solution to survey, investigate, validate, design, supply and install 3 x passenger lifts and 1 x firefighting lift and Paragon house campus. The new contract will commence from February 2024 the new lifts will be installed in a phase programme to ensure 3 lifts are in operation at any one time and must complete by including all design, manufacture, and installation. The Principal Contractor will be fully responsible for arranging, design, supply, installation and compliance of the refurbished lifts and associated works to including safe access to undertake the works including full risk assessment and method statements considering the internal and external site and the close location of the adjacent neighbours.
Works
22/12/2023 12:00:00
42416100-6 Lifts
45313100-5 Lift installation work
50750000-7 Lift-maintenance services
45214400-4 Construction work for university buildings
University of West London
St Mary's Road, Ealing
W5 2NU
London
United Kingdom
View profile
Notice | Date of dispatch |
---|---|
Live Opportunity (Contracts Finder) | 22/11/2023 16:10 |