The University of Plymouth is looking to reinforce its reputation as an innovative centre of excellence for engineering research, teaching and learning. The new Engineering and Design facility (NEDF) being constructed on the western edge of the main Plymouth campus will provide a new home for the specialist laboratories and teaching facilities of the School of Engineering,Computing and Mathematics and theSchool of Art, Design and Architecture. NEDF integrates a fully refurbished Babbage Building with a new-build, wrap-around area to create more than 10,300m² of research laboratories and teaching spaces. New, state-of-the-art resources are planned that will enable engineering teaching and research to underpin the fourth industrial revolution and complement existing equipment. The new building and its physical resources will inspire the development of new inter-disciplinary activities in teaching, learning and research, and nurture the innovative graduate engineers demanded by future society. The objective here is to create a new CNC machining facility that will be operated by our team of highly-skilled engineering technicians. To this end, we wish to install a CNC lathe and CNC mill with tool room precision capabilities that are fully integrated with industry standard CADCAM software tools.
12/12/2022 12:00:00
42621100-6 CNC lathe
42620000-8 Lathes, boring and milling machine tools
University of Plymouth
Drake Circus
PL4 8AA
Plymouth, Devon
United Kingdom
View profile
https://www.plymouth.ac.uk/about-us/university-structure/service-areas/procurement
Notice | Date of dispatch |
---|---|
Live Opportunity (Contracts Finder) | 11/11/2022 12:08 |
Contract notice (FTS) | |
Awarded Contract (Contracts Finder) | 03/04/2023 15:19 |
Contract award notice (FTS) |