UKIFS require PB curves which will determine the maximum voltage at which the STEP TF magnets can be discharged. This maximum voltage is a design driving parameter, and so is critical for the development of the TF concept. A series of PB curves is required, which will consist of breakdown voltage vs. gas pressure (or density x distance), including the effects of background magnetic field, geometry, gas type and gas temperature.
[Services]
21/01/2025 11:00:00
73200000-4 [48518]
73000000-2 [48512]
73300000-5 [48521]
31600000-2 [42316]
UK Atomic Energy Authority
Culham Science Centre
OX14 3DB
Oxfordshire
[GB]
[ViewProfile]
https://www.gov.uk/government/organisations/uk-atomic-energy-authority
| [Notice] | [DispatchDate] |
|---|---|
| [FtsS09F01PriorInformationNotice] ([FTS]) |