The objective of the wider project is to develop a requirements set and associated pre-conceptual design, for a microwave test facility. This test facility may include the ability to test any of the following: -Component level testing e.g. gyrotron cavity -High-powered gyrotrons -Novel source testing -Waveguide testing -Low power microwave testing -Launcher mechanical testing -Quasi-optical propagation testing The areas of primary interest for this opportunity are: -Microwave source testing -High-powered microwave component testing -Gyrotron cavity thermal test rig It is anticipated, subject to market engagement, that a maximum of 5 contracts will be awarded to parties with an interest in future use of such a facility. The estimated budget for each contract is between £10,000 and £20,000. This piece of work is required to be completed by the end of February 2025, it is anticipated that this contract will be 4 months long. The contract scope is proposed to include the following deliverables: -Definition of scope for an overall test facility -Definition of technical requirements for an overall test facility -Report of anticipated use of test facility -Definition of technical requirements for a gyrotron cavity test rig (additional scope)
[Services]
24.07.2024 16:00:00
73210000-7 [48519]
71621000-7 [48237]
73000000-2 [48512]
73200000-4 [48518]
73220000-0 [48520]
UK Atomic Energy Authority
Culham Science Centre
OX14 3DB
Oxfordshire
[GB]
[ViewProfile]
https://www.gov.uk/government/organisations/uk-atomic-energy-authority
| [Notice] | [DispatchDate] |
|---|---|
| [FtsS09F01PriorInformationNotice] ([FTS]) |