The purpose of the JET Decommissioning and Repurposing (JDR) programme is to deliver the safe decommissioning and repurposing of the JET facilities in an ethical, innovative manner, demonstrating maximum value for money. JDR is organised into a variety of projects, each delivering an agreed part of the overall technical scope required to deliver the programme. JET deploys a remote handling system for the maintenance and upgrade of the tokamak. A test stand is required to provide the necessary functionality to allow existing devices, the 3rd Arm and winch, to be load tested in conformance with relevant test plans and operation manuals for the purpose of regulatory compliance. Both devices are attachments, mechanically mounted to a common bolt hole pattern on the chest plate of the MASCOT remote manipulator.
Supplies
31/03/2023 12:00:00
42410000-3 Lifting and handling equipment
71333000-1 Mechanical engineering services
42418500-4 Mechanical handling equipment
71300000-1 Engineering services
71330000-0 Miscellaneous engineering services
42414310-7 Mobile lifting frames
42418900-8 Loading or handling machinery
UK Atomic Energy Authority
Culham Science Centre
OX14 3DB
Oxfordshire
United Kingdom
View profile
https://www.gov.uk/government/organisations/uk-atomic-energy-authority
Notice | Date of dispatch |
---|---|
Live Opportunity (Contracts Finder) | 03/03/2023 16:13 |