As part of the EUROfusion DEMO gateway objectives, the PbLi loop is required to test a prototypical mock-up (PMU) of the breeder zone under combined heat and magnetic loading conditions from around 202.
Services
16/01/2023 12:00:00
51230000-3 Installation services of testing equipment
51000000-9 Installation services (except software)
51100000-3 Installation services of electrical and mechanical equipment
51110000-6 Installation services of electrical equipment
51120000-9 Installation services of mechanical equipment
51210000-7 Installation services of measuring equipment
51500000-7 Installation services of machinery and equipment
71241000-9 Feasibility study, advisory service, analysis
71242000-6 Project and design preparation, estimation of costs
71300000-1 Engineering services
71310000-4 Consultative engineering and construction services
71314100-3 Electrical services
71318000-0 Advisory and consultative engineering services
71330000-0 Miscellaneous engineering services
71333000-1 Mechanical engineering services
71335000-5 Engineering studies
71336000-2 Engineering support services
71340000-3 Integrated engineering services
71350000-6 Engineering-related scientific and technical services
71356000-8 Technical services
71600000-4 Technical testing, analysis and consultancy services
71620000-0 Analysis services
71621000-7 Technical analysis or consultancy services
UK Atomic Energy Authority
Culham Science Centre
OX14 3DB
Oxfordshire
United Kingdom
View profile
https://www.gov.uk/government/organisations/uk-atomic-energy-authority
Notice | Date of dispatch |
---|---|
Prior information notice (FTS) |